An analysis of macro-level factors impacting the volume of formal disputes in the UK construction industry

This paper examines macro level factors affecting number of adjudications in the UK construction industry. The literature focused only on the micro project level causes of disputes rather than macro factors affecting willingness to compromise. This paper proposes that level of competition affects willingness to compromise, which further impacts the choices of dispute options. A rigorous general-to-specific process was adopted to identify the optimal ARDL Model. Cointegration was concluded in the final model which was used to evaluate 7 refutable hypotheses based on data from Q3 1999 to Q1 2024. The final model was found to be stable with high speed of adjustment. Significant factors impacting number of adjudications include percentage of refurbishment and maintenance work and unemployment rate in the long run, and construction output in the short run, while marginally significant factors include construction output and number of people in industry in the long run and unemployment rate in the short run. Domino effects are also evidenced. It is concluded that macro level factors will impact number of formal disputes, possibly through changes in willingness to compromise. Possible explanations for the structural break from Q4 2013 to Q1 2017 are also provided.

Authors

Institutions

Publication Details

Journal
Construction Management and Economics
Published
2026-10-13
DOI
https://doi.org/10.1080/01446193.2026.2739476
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An analysis of macro-level factors impacting the volume of formal disputes in the UK construction industry

Neema Kavishe, Ping Yung
Construction Management and Economics
Construction Project Management and Performance
article

An analysis of macro-level factors impacting the volume of formal disputes in the UK construction industry

Neema Kavishe, Ping Yung
article en

Abstract

This paper examines macro level factors affecting number of adjudications in the UK construction industry. The literature focused only on the micro project level causes of disputes rather than macro factors affecting willingness to compromise. This paper proposes that level of competition affects willingness to compromise, which further impacts the choices of dispute options. A rigorous general-to-specific process was adopted to identify the optimal ARDL Model. Cointegration was concluded in the final model which was used to evaluate 7 refutable hypotheses based on data from Q3 1999 to Q1 2024. The final model was found to be stable with high speed of adjustment. Significant factors impacting number of adjudications include percentage of refurbishment and maintenance work and unemployment rate in the long run, and construction output in the short run, while marginally significant factors include construction output and number of people in industry in the long run and unemployment rate in the short run. Domino effects are also evidenced. It is concluded that macro level factors will impact number of formal disputes, possibly through changes in willingness to compromise. Possible explanations for the structural break from Q4 2013 to Q1 2017 are also provided.

Construction Management and Economics
Leeds Beckett University (GB)
Glasgow Caledonian University, King Saud University
Openalex Percentile: Top 9%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.