Preloaded and premoistened foundation that overlaps sabkha collapse treatment with construction evaluated by coupled infiltration and consolidation analysis

Conventional improvement methods applied to sabkha soil (collapse soil) are time-consuming, lengthening the project schedule. This paper presents a novel preliminary concept for a pre-loaded, pre-moistened shallow foundation engineered construction. A single-footing cast directly on dry sabkha incorporates a 3 × 3 array of vertical holes through which distilled water is introduced, advancing as a Green-Ampt wetting front and dissolving the evaporitic bonds before superstructure load application. The improvement phase overlaps temporally with foundation construction, thereby removing the improvement task from the critical path, as per the schedule overlap principle. A coupled boundary-value problem (Terzaghi consolidation) and a transient infiltration problem are developed to model consolidation and collapse settlement due to wetting, and they are verified against a plane-strain elastic stress analysis and a one-dimensional coupled hydro-mechanical Richards-BBM model. Results show that the innovative foundation mobilizes approximately 434 mm of collapse settlement within 12 days (reaching 509.6 mm total settlement including elastic deformation), accounting for close to 90% of the layer's 480 mm theoretical collapse potential (CP. H). Analytical (477 mm) and numerical BBM-LC (456 mm) models confirm near-complete collapse mobilization to superstructure placement. The schedule overlap reduces the pre-superstructure phase by 62% compared with traditional pre-wetting. This saving depends on the in-situ hydraulic conductivity. At 0.70 m sleeve spacing, the probability of completing wetting-collapse within the 14-day window is 0.62, so site-specific k v measurement and a pilot infiltration test are required.

Authors

Institutions

Publication Details

Journal
Scientific Reports
Published
2026-10-13
DOI
https://doi.org/10.1038/s41598-026-75434-y
Primary Topic
Geotechnical Engineering and Soil Stabilization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Preloaded and premoistened foundation that overlaps sabkha collapse treatment with construction evaluated by coupled infiltration and consolidation analysis

عبدالرحمن بن محمود, Salman Akhtar, Khalid Al-Gahtani, Naif Alsanabani
Scientific Reports
Geotechnical Engineering and Soil Stabilization
article

Preloaded and premoistened foundation that overlaps sabkha collapse treatment with construction evaluated by coupled infiltration and consolidation analysis

عبدالرحمن بن محمود, Salman Akhtar, Khalid Al-Gahtani, Naif Alsanabani
article en

Abstract

Conventional improvement methods applied to sabkha soil (collapse soil) are time-consuming, lengthening the project schedule. This paper presents a novel preliminary concept for a pre-loaded, pre-moistened shallow foundation engineered construction. A single-footing cast directly on dry sabkha incorporates a 3 × 3 array of vertical holes through which distilled water is introduced, advancing as a Green-Ampt wetting front and dissolving the evaporitic bonds before superstructure load application. The improvement phase overlaps temporally with foundation construction, thereby removing the improvement task from the critical path, as per the schedule overlap principle. A coupled boundary-value problem (Terzaghi consolidation) and a transient infiltration problem are developed to model consolidation and collapse settlement due to wetting, and they are verified against a plane-strain elastic stress analysis and a one-dimensional coupled hydro-mechanical Richards-BBM model. Results show that the innovative foundation mobilizes approximately 434 mm of collapse settlement within 12 days (reaching 509.6 mm total settlement including elastic deformation), accounting for close to 90% of the layer's 480 mm theoretical collapse potential (CP. H). Analytical (477 mm) and numerical BBM-LC (456 mm) models confirm near-complete collapse mobilization to superstructure placement. The schedule overlap reduces the pre-superstructure phase by 62% compared with traditional pre-wetting. This saving depends on the in-situ hydraulic conductivity. At 0.70 m sleeve spacing, the probability of completing wetting-collapse within the 14-day window is 0.62, so site-specific k v measurement and a pilot infiltration test are required.

Scientific Reports
King Saud University (SA)
Openalex Percentile: Top 18%
Geotechnical Engineering and Soil Stabilization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.