An intelligent multi-objective decision framework for Time–Cost–Quality optimization in construction scheduling using AHP and OBL–NSGA-III

Construction scheduling requires simultaneous optimization of project time, cost, and quality; however, most existing time–cost trade-off (TCTO) models inadequately incorporate construction quality as a quantitative optimization objective. This study proposes an intelligent hybrid decision framework that integrates the Analytic Hierarchy Process (AHP) with an Opposition-Based Learning-enhanced Non-dominated Sorting Genetic Algorithm III (OBL–NSGA-III) to solve the time–cost–quality trade-off (TCQT) problem. AHP is employed to derive activity importance and quality indicator weights from expert judgments for constructing a Project Quality Index (PQI), while OBL–NSGA-III improves population diversity and convergence to generate high-quality Pareto-optimal solutions. The framework is validated using a real residential building project consisting of thirteen activities with multiple execution modes. The proposed model produced 23 Pareto-optimal scheduling alternatives, enabling decision-makers to select solutions that best satisfy project priorities. Comparative evaluation against NSGA-III, MOPSO, MOACO, OB-MODE, and LHS-based NSGA-III demonstrated superior convergence, solution diversity, hypervolume, and the generation of unique non-dominated solutions. Sensitivity analysis further confirmed the robustness of the selected schedules under varying stakeholder preferences. The proposed framework provides an effective and transparent decision-support tool for construction scheduling and establishes a flexible foundation for future extensions involving uncertainty, resource constraints, sustainability objectives, and digital construction technologies.

Authors

Institutions

Publication Details

Journal
Discover Artificial Intelligence
Published
2026-10-13
DOI
https://doi.org/10.1007/s44163-026-02456-w
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An intelligent multi-objective decision framework for Time–Cost–Quality optimization in construction scheduling using AHP and OBL–NSGA-III

Bhabani Prasad Sahoo, Bimalendu Dash, Sandeep Kumar Sahoo, Sandhyarani Mahalik et al.
Discover Artificial Intelligence
Resource-Constrained Project Scheduling
article

An intelligent multi-objective decision framework for Time–Cost–Quality optimization in construction scheduling using AHP and OBL–NSGA-III

Bhabani Prasad Sahoo, Bimalendu Dash, Sandeep Kumar Sahoo, Sandhyarani Mahalik, Dr. RVVSV Prasad, A. Venkatakrishna, GVLN Murthy, Saiprasad Potharaju
article en

Abstract

Construction scheduling requires simultaneous optimization of project time, cost, and quality; however, most existing time–cost trade-off (TCTO) models inadequately incorporate construction quality as a quantitative optimization objective. This study proposes an intelligent hybrid decision framework that integrates the Analytic Hierarchy Process (AHP) with an Opposition-Based Learning-enhanced Non-dominated Sorting Genetic Algorithm III (OBL–NSGA-III) to solve the time–cost–quality trade-off (TCQT) problem. AHP is employed to derive activity importance and quality indicator weights from expert judgments for constructing a Project Quality Index (PQI), while OBL–NSGA-III improves population diversity and convergence to generate high-quality Pareto-optimal solutions. The framework is validated using a real residential building project consisting of thirteen activities with multiple execution modes. The proposed model produced 23 Pareto-optimal scheduling alternatives, enabling decision-makers to select solutions that best satisfy project priorities. Comparative evaluation against NSGA-III, MOPSO, MOACO, OB-MODE, and LHS-based NSGA-III demonstrated superior convergence, solution diversity, hypervolume, and the generation of unique non-dominated solutions. Sensitivity analysis further confirmed the robustness of the selected schedules under varying stakeholder preferences. The proposed framework provides an effective and transparent decision-support tool for construction scheduling and establishes a flexible foundation for future extensions involving uncertainty, resource constraints, sustainability objectives, and digital construction technologies.

Discover Artificial IntelligenceVol. 6(1)
Indira Gandhi Institute of Technology (IN), Symbiosis International University (IN), GITAM University (IN)
Openalex Percentile: Top 10%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.