Comparing Climate and Cost Performance of On- and Off-Site Concrete Facility Construction Projects: A German Case Study

Selecting a reinforced concrete construction system is usually justified either economically or environmentally, and the two perspectives are rarely derived from the same project data. It therefore remains unclear whether the cost-optimal and the carbon-optimal choice coincide, and whether the differences between the systems are large enough to be distinguished from the uncertainty of the underlying assumptions. This study addresses that question for a real industrial building in northern Germany. Cast in situ, fully precast, and semi-precast systems were compared for the walls, slabs, and beams of a technical building, using contractor cost calculations and supplier quotations for the direct construction costs, and project-specific material quantities with generic emission factors for the construction-phase embodied carbon (modules A1–A5 of the European Norm EN 15978), both based on identical functional units. The direct costs differ substantially: the semi-precast double wall was 27.2% and the filigree slab 50.3% cheaper than their cast in situ equivalents, the fully precast wall and slab were 46.0% and 62.7% more expensive, and precast beams were 15.4% cheaper. The embodied carbon results differ by at most 5.1% between any two alternatives, and a one-at-a-time sensitivity analysis over ten parameters shows that this difference is not robust, since its sign changes within plausible parameter ranges; the cement content of the plant concrete is the dominant uncertainty. Material production accounts for 87% to 94% of the total in every case. The choice of construction system is therefore primarily an economic decision, whereas embodied carbon has to be addressed through material-related measures rather than through the construction method.

Authors

Institutions

Publication Details

Journal
Sustainability
Published
2026-10-12
DOI
https://doi.org/10.3390/su182010359
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Comparing Climate and Cost Performance of On- and Off-Site Concrete Facility Construction Projects: A German Case Study

Panagiotis Spyridis, Timm Draeger, Carsten Peper
Sustainability
BIM and Construction Integration
article

Comparing Climate and Cost Performance of On- and Off-Site Concrete Facility Construction Projects: A German Case Study

Panagiotis Spyridis, Timm Draeger, Carsten Peper
article en

Abstract

Selecting a reinforced concrete construction system is usually justified either economically or environmentally, and the two perspectives are rarely derived from the same project data. It therefore remains unclear whether the cost-optimal and the carbon-optimal choice coincide, and whether the differences between the systems are large enough to be distinguished from the uncertainty of the underlying assumptions. This study addresses that question for a real industrial building in northern Germany. Cast in situ, fully precast, and semi-precast systems were compared for the walls, slabs, and beams of a technical building, using contractor cost calculations and supplier quotations for the direct construction costs, and project-specific material quantities with generic emission factors for the construction-phase embodied carbon (modules A1–A5 of the European Norm EN 15978), both based on identical functional units. The direct costs differ substantially: the semi-precast double wall was 27.2% and the filigree slab 50.3% cheaper than their cast in situ equivalents, the fully precast wall and slab were 46.0% and 62.7% more expensive, and precast beams were 15.4% cheaper. The embodied carbon results differ by at most 5.1% between any two alternatives, and a one-at-a-time sensitivity analysis over ten parameters shows that this difference is not robust, since its sign changes within plausible parameter ranges; the cement content of the plant concrete is the dominant uncertainty. Material production accounts for 87% to 94% of the total in every case. The choice of construction system is therefore primarily an economic decision, whereas embodied carbon has to be addressed through material-related measures rather than through the construction method.

SustainabilityVol. 18(20)
University of Rostock (DE)
Openalex Percentile: Top 15%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Comparing Climate and Cost Performance of On- and Off-Site Concrete Facility Construction Projects: A German Case Study — Panagiotis Spyridis, Timm Draeger, et al. · Sustainability (2026) | TGRS Research Map | TGRS