Schedules for pick-and-place robots

Abstract The efficiency of pick-and-place robots that put parts into boxes relies on efficient schedules, which determine the order in which parts are picked. The scheduling problem can be formulated as an integer linear program (ILP). However, the resulting ILP cannot be solved for realistic scenarios. Therefore, approximate solution techniques based on local search heuristics and simplified ILPs are introduced. It will be shown that ILP-based solutions outperform search heuristics in terms of solution times and solution quality. Additionally, we consider an extended version of the pick-and-place robot with two arms. It is shown that the resulting scheduling problem can be handled similarly to the problem for the robot with one arm, but the number of variables in the resulting ILP increases from $$O(P^3)$$ O ( P 3 ) for one arm to $$O(P^6)$$ O ( P 6 ) for two arms, where P is the number of parts to be picked. Consequently, decomposition-based approaches are introduced that reduce the scheduling problem for two arms to several problems with one arm.

Authors

Institutions

Publication Details

Journal
Journal of Scheduling
Published
2026-10-09
DOI
https://doi.org/10.1007/s10951-026-00888-x
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Schedules for pick-and-place robots

Alexander Puzicha, Peter Buchholz
Journal of Scheduling
Scheduling and Optimization Algorithms
article

Schedules for pick-and-place robots

Alexander Puzicha, Peter Buchholz
article en

Abstract

Abstract The efficiency of pick-and-place robots that put parts into boxes relies on efficient schedules, which determine the order in which parts are picked. The scheduling problem can be formulated as an integer linear program (ILP). However, the resulting ILP cannot be solved for realistic scenarios. Therefore, approximate solution techniques based on local search heuristics and simplified ILPs are introduced. It will be shown that ILP-based solutions outperform search heuristics in terms of solution times and solution quality. Additionally, we consider an extended version of the pick-and-place robot with two arms. It is shown that the resulting scheduling problem can be handled similarly to the problem for the robot with one arm, but the number of variables in the resulting ILP increases from $$O(P^3)$$ O ( P 3 ) for one arm to $$O(P^6)$$ O ( P 6 ) for two arms, where P is the number of parts to be picked. Consequently, decomposition-based approaches are introduced that reduce the scheduling problem for two arms to several problems with one arm.

Journal of Scheduling
TU Dortmund University (DE)
Openalex Percentile: Top 12%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Schedules for pick-and-place robots — Alexander Puzicha, Peter Buchholz · Journal of Scheduling (2026) | TGRS Research Map | TGRS