Speedup or Closure: The Global Shop Floor of 1970s Silicon Valley
Between 1968 and 1978, the overseas plants of Signetics Corporation, a manufacturer of integrated circuits (ICs) based in Silicon Valley, were host to numerous job actions and genuine organizing campaigns by workers, including at least two strikes that went a long way toward stifling production. The results of these actions were, to say the least, mixed. Some succeeded in yielding concessions, particularly with respect to wages; others led directly to plant closures despite the relatively modest demands involved. Exploring these confrontations and their disparate outcomes provides a rare window onto class conflict in the semiconductor industry and allows us to test where existing explanations of deindustrialization apply to such high-tech production and where new ones might be needed.
Authors
- Joseph Daniel Parziale (ORCID: https://orcid.org/0000-0003-1835-4248)
Institutions
- University of Illinois Chicago (US)
Publication Details
- Journal
- International Labor and Working-Class History
- Published
- 2026-10-08
- DOI
- https://doi.org/10.1017/s0147547926100313
- Primary Topic
- Labor Movements and Unions
- Type
- article
- Field-Weighted Citation Impact
- 0.00