Management of Protocols (VE-P1 v0.2.0)

Management of Protocols (VE-P1 v0.2.0) is a draft for comment and is not citable in a conformance claim. It governs the lifecycle of a protocol published by The Valuation Engineer: how one is proposed, reviewed, exposed for comment, released, maintained, revised and withdrawn, and what record each step leaves. A protocol means a specific instruction for the execution of a defined task, ordinarily a valuation task; it is not a standard, and standards belong to the professional bodies that issue them. The draft's requirements cover proposal, drafting, review by a named and published roster, the recorded disposition of every comment, release only when the conformance suite passes, review intervals not exceeding five years, withdrawal, and records. The procedure does not govern how a protocol is written, creates no obligation on any valuer, and does not determine whether a protocol is technically correct. The draft names its open points: no public comment process, no appeal, and no definition of consensus.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-10-01
DOI
https://doi.org/10.5281/zenodo.22901970
Primary Topic
Engineering and Material Science Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
article

Management of Protocols (VE-P1 v0.2.0)

William Bert Craytor
Zenodo (CERN European Organization for Nuclear Research)
Engineering and Material Science Research
article

Management of Protocols (VE-P1 v0.2.0)

William Bert Craytor
article en

Abstract

Management of Protocols (VE-P1 v0.2.0) is a draft for comment and is not citable in a conformance claim. It governs the lifecycle of a protocol published by The Valuation Engineer: how one is proposed, reviewed, exposed for comment, released, maintained, revised and withdrawn, and what record each step leaves. A protocol means a specific instruction for the execution of a defined task, ordinarily a valuation task; it is not a standard, and standards belong to the professional bodies that issue them. The draft's requirements cover proposal, drafting, review by a named and published roster, the recorded disposition of every comment, release only when the conformance suite passes, review intervals not exceeding five years, withdrawal, and records. The procedure does not govern how a protocol is written, creates no obligation on any valuer, and does not determine whether a protocol is technically correct. The draft names its open points: no public comment process, no appeal, and no definition of consensus.

Zenodo (CERN European Organization for Nuclear Research)
Openalex Percentile: Top 2%
Engineering and Material Science Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.