Hybrid Project Management Readiness in Romanian Construction Companies: An Exploratory Survey from a Small Construction-Company Context

Construction companies need both planning/control and flexibility, but practical readiness for hybrid project management is still unclear. This study analyzes readiness for hybrid project management adoption in a small Romanian construction-company context using two questionnaire datasets: a hybrid project management questionnaire with 26 valid responses and an Agile questionnaire with 31 valid responses. The analysis used descriptive statistics, simple categorical tests, binary coding for multiple-response items, and thematic interpretation of open-ended answers. The results show that readiness is mainly partial. Overall, 57.7% of respondents did not know the concept of hybrid project management, while 72.0% evaluated organizational readiness as partial and 70.8% evaluated team readiness as partial. The main barrier was lack of knowledge about Agile or hybrid methodologies (84.0%), and the strongest support need was training and certifications (84.6%). The Agile questionnaire showed strong contextual conditions, such as openness to change, client feedback integration, and collaborative culture, but formal Agile implementation experience was low (33.3%). The study suggests that adoption should start gradually, through awareness, training, simple procedures, pilot projects, and better communication between teams.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2026-09-29
DOI
https://doi.org/10.3390/buildings16193877
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
article

Hybrid Project Management Readiness in Romanian Construction Companies: An Exploratory Survey from a Small Construction-Company Context

Marius-Valentin Drăgoi, Alexandru MARIN, Laura Boanță, Cozmin Adrian Cristoiu et al.
Buildings
Construction Project Management and Performance
article

Hybrid Project Management Readiness in Romanian Construction Companies: An Exploratory Survey from a Small Construction-Company Context

Marius-Valentin Drăgoi, Alexandru MARIN, Laura Boanță, Cozmin Adrian Cristoiu, Dragoș-Oliviu ȘERBAN
article en

Abstract

Construction companies need both planning/control and flexibility, but practical readiness for hybrid project management is still unclear. This study analyzes readiness for hybrid project management adoption in a small Romanian construction-company context using two questionnaire datasets: a hybrid project management questionnaire with 26 valid responses and an Agile questionnaire with 31 valid responses. The analysis used descriptive statistics, simple categorical tests, binary coding for multiple-response items, and thematic interpretation of open-ended answers. The results show that readiness is mainly partial. Overall, 57.7% of respondents did not know the concept of hybrid project management, while 72.0% evaluated organizational readiness as partial and 70.8% evaluated team readiness as partial. The main barrier was lack of knowledge about Agile or hybrid methodologies (84.0%), and the strongest support need was training and certifications (84.6%). The Agile questionnaire showed strong contextual conditions, such as openness to change, client feedback integration, and collaborative culture, but formal Agile implementation experience was low (33.3%). The study suggests that adoption should start gradually, through awareness, training, simple procedures, pilot projects, and better communication between teams.

BuildingsVol. 16(19)
Universitatea Națională de Știință și Tehnologie Politehnica București (RO)
Industry, innovation and infrastructure
Openalex Percentile: Top 7%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Hybrid Project Management Readiness in Romanian Construction Companies: An Exploratory Survey from a Small Construction-Company Context — Marius-Valentin Drăgoi, Alexandru MARIN, et al. · Buildings (2026) | TGRS Research Map | TGRS