Early Termination Provisions in Public–Private Partnerships: Synthesizing Institutional Guidance into Process-Based Benchmarks
Abstract Early termination provisions (ETPs) are critical risk management mechanisms in public–private partnership (PPP) contracts, defining the conditions, processes, and consequences under which contracts may be terminated before their expiry. While leading institutional guidance documents provide extensive and authoritative treatment of ETPs, their coverage is dispersed across different mandates, drafting styles, and levels of procedural detail, making it difficult to extract a coherent, operational benchmark directly from the guidance. The objective of this study is to systematically synthesize institutional PPP guidance into a unified, process-based benchmark for early termination. Using inductive qualitative content analysis methodology, the study examines guidance issued by five widely recognized institutions: the World Bank, the United Nations Commission on International Trade Law (UNCITRAL), the European PPP Expertise Centre (EPEC), the Inter-American Development Bank (IDB), and the US Federal Highway Administration (FHWA). The analysis identifies five principal ETP categories—private partner default, contracting authority default, voluntary termination, force majeure (FM), and uninsurability—and, where applicable, drives analytically grounded subcategories. These findings are translated into five benchmark flowcharts that operationalize early termination as a sequenced process structured around circumstances, procedures, and consequences. The results demonstrate that, despite differences in articulation and drafting depth, institutional guidance reflects a shared conceptual framework in which early termination is an exceptional outcome following the failure of cure, adaptation, or policy intervention mechanisms. The resulting benchmarks provide a practical reference for institutions to design, assess, and align ETP regimes in PPP contracts, supporting clearer risk allocation, improved governance, and more defensible termination practices.
Authors
- Ahmed Abdel Aziz (ORCID: https://orcid.org/0000-0002-3487-8992)
- Miriam Ccarita Cruz
Institutions
- University of Washington (US)
Publication Details
- Journal
- Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Published
- 2026-09-29
- DOI
- https://doi.org/10.1061/jladah.ladr-1598
- Primary Topic
- Public-Private Partnership Projects
- Type
- article
- Field-Weighted Citation Impact
- 0.00