From Risk Assessment to Procurement Decision: A Systematic Review in Construction

Risk management and procurement are established fields in construction research, but the decision chain connecting them has not been examined as an object in itself. This review asked whether exposure identified by risk analysis reaches the sourcing decision, whether that decision is fixed contractually, and whether performance data returns to the assessment. Following the PRISMA 2020 statement, one hundred and ninety-seven records were retrieved through eight structured searches, citation chaining and hand searching. After duplicate removal, screening and eligibility assessment, one hundred and thirty studies were coded against a five-stage chain comprising exposure diagnosis, analytical triage, procurement allocation, contractual fixing, and monitoring with feedback. Coverage was analysed at stage level, at span level, and as a pairwise co-occurrence matrix, with a sensitivity analysis excluding venues not indexed in Scopus. Every stage proved substantially covered, from ninety studies addressing exposure diagnosis to thirteen addressing monitoring and feedback. Adjacent transitions were far thinner. Forty-two studies linked diagnosis to analysis, but nine linked analyses to a procurement decision, nine linked procurements to the contract, and two linked the contract to monitoring. One hundred and ten studies spanned two stages or fewer, two traversed analyses through procurement into contractual terms, and none covered all five. The findings were stable across corpus sizes and insensitive to venue exclusion. The review contributes a decision-chain coding scheme, evidence that the field's central prescriptive claim rests on a narrow empirical base, and a research agenda addressing the untraversed transitions.

Authors

Institutions

Publication Details

Journal
Iconic Research and Engineering Journals
Published
2026-09-28
DOI
https://doi.org/10.64388/irev10i3-1723381
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
article

From Risk Assessment to Procurement Decision: A Systematic Review in Construction

Samaila Mande, Aliyu SULEIMAN, Abubakar Abdulkadir Tukur, Precious P. Sokari et al.
Iconic Research and Engineering Journals
Construction Project Management and Performance
article

From Risk Assessment to Procurement Decision: A Systematic Review in Construction

Samaila Mande, Aliyu SULEIMAN, Abubakar Abdulkadir Tukur, Precious P. Sokari, Umar Farouq Yahaya
article en

Abstract

Risk management and procurement are established fields in construction research, but the decision chain connecting them has not been examined as an object in itself. This review asked whether exposure identified by risk analysis reaches the sourcing decision, whether that decision is fixed contractually, and whether performance data returns to the assessment. Following the PRISMA 2020 statement, one hundred and ninety-seven records were retrieved through eight structured searches, citation chaining and hand searching. After duplicate removal, screening and eligibility assessment, one hundred and thirty studies were coded against a five-stage chain comprising exposure diagnosis, analytical triage, procurement allocation, contractual fixing, and monitoring with feedback. Coverage was analysed at stage level, at span level, and as a pairwise co-occurrence matrix, with a sensitivity analysis excluding venues not indexed in Scopus. Every stage proved substantially covered, from ninety studies addressing exposure diagnosis to thirteen addressing monitoring and feedback. Adjacent transitions were far thinner. Forty-two studies linked diagnosis to analysis, but nine linked analyses to a procurement decision, nine linked procurements to the contract, and two linked the contract to monitoring. One hundred and ten studies spanned two stages or fewer, two traversed analyses through procurement into contractual terms, and none covered all five. The findings were stable across corpus sizes and insensitive to venue exclusion. The review contributes a decision-chain coding scheme, evidence that the field's central prescriptive claim rests on a narrow empirical base, and a research agenda addressing the untraversed transitions.

Iconic Research and Engineering JournalsVol. 10(3)
Ahmadu Bello University (NG)
Reduced inequalities
Openalex Percentile: Top 7%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

From Risk Assessment to Procurement Decision: A Systematic Review in Construction — Samaila Mande, Aliyu SULEIMAN, et al. · Iconic Research and Engineering Journals (2026) | TGRS Research Map | TGRS