Benchmarking BIM graduate readiness using a competency gap index: evidence from a mixed-methods study

Purpose This study assesses perceived building information modelling (BIM) graduate readiness for workforce entry in Malaysia by examining competency gaps using the Competency Gap Index (CGI). It addresses the perceived misalignment between graduates' current capabilities and industry-expected competencies in Construction 4.0 contexts, and proposes CGI as a structured diagnostic and benchmarking tool. Design/methodology/approach An explanatory sequential mixed-methods design was adopted. A survey of 80 recent BIM graduates measured perceived expected and self-assessed actual competency levels across 20 competencies; following reliability refinement, 19 competencies were analysed using the CGI. Subsequently, 15 semi-structured interviews were conducted to explain the identified gaps. Quantitative data were analysed using SPSS and Excel, while qualitative data were analysed thematically using NVivo. Findings Technical competencies show relatively lower perceived gaps (14.43%), while the largest perceived gaps are observed in process (23.91%) and managerial/strategic (22.73%) competencies, particularly in ISO 19650 compliance, lifecycle integration and digital leadership. Interview findings indicate that BIM education remains tool-focused, with limited emphasis on governance, coordination, and applied workflows. Practical implications CGI provides a structured basis for diagnosing perceived workforce readiness and informing curriculum design, training and policy interventions. Its wider use requires contextual adaptation, stakeholder validation and calibration against local professional requirements. Originality/value The study operationalises perceived BIM workforce readiness as a measurable index, offering a transparent and comparable diagnostic framework for Construction 4.0 capability development based on perceived competency gaps.

Authors

Institutions

Publication Details

Journal
Built Environment Project and Asset Management
Published
2026-09-21
DOI
https://doi.org/10.1108/bepam-10-2025-0339
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
article

Benchmarking BIM graduate readiness using a competency gap index: evidence from a mixed-methods study

Teck Wei Ng, Leilei Wang, Wei Ying Choong
Built Environment Project and Asset Management
BIM and Construction Integration
article

Benchmarking BIM graduate readiness using a competency gap index: evidence from a mixed-methods study

Teck Wei Ng, Leilei Wang, Wei Ying Choong
article en

Abstract

Purpose This study assesses perceived building information modelling (BIM) graduate readiness for workforce entry in Malaysia by examining competency gaps using the Competency Gap Index (CGI). It addresses the perceived misalignment between graduates' current capabilities and industry-expected competencies in Construction 4.0 contexts, and proposes CGI as a structured diagnostic and benchmarking tool. Design/methodology/approach An explanatory sequential mixed-methods design was adopted. A survey of 80 recent BIM graduates measured perceived expected and self-assessed actual competency levels across 20 competencies; following reliability refinement, 19 competencies were analysed using the CGI. Subsequently, 15 semi-structured interviews were conducted to explain the identified gaps. Quantitative data were analysed using SPSS and Excel, while qualitative data were analysed thematically using NVivo. Findings Technical competencies show relatively lower perceived gaps (14.43%), while the largest perceived gaps are observed in process (23.91%) and managerial/strategic (22.73%) competencies, particularly in ISO 19650 compliance, lifecycle integration and digital leadership. Interview findings indicate that BIM education remains tool-focused, with limited emphasis on governance, coordination, and applied workflows. Practical implications CGI provides a structured basis for diagnosing perceived workforce readiness and informing curriculum design, training and policy interventions. Its wider use requires contextual adaptation, stakeholder validation and calibration against local professional requirements. Originality/value The study operationalises perceived BIM workforce readiness as a measurable index, offering a transparent and comparable diagnostic framework for Construction 4.0 capability development based on perceived competency gaps.

Built Environment Project and Asset Management
Tunku Abdul Rahman University of Management and Technology (MY), Universiti Tunku Abdul Rahman (MY)
Industry, innovation and infrastructure
Openalex Percentile: Top 14%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.