Baseline performance in multi-project scheduling for SMEs: evidence from microsoft project and MPSPLib

Small and medium-sized enterprises (SMEs) often manage multiple concurrent projects with limited resources but rely on general-purpose commercial project scheduling software due to affordability and accessibility constraints. While the research community has advanced powerful heuristic algorithms validated on benchmarks, the performance of commercial tools in complex multi-project environments has received little systematic evaluation. This paper evaluates Microsoft Project 2024, considered as a representative example of a widely available general-purpose scheduling tool, on the full MPSPLib benchmark suite (140 multi-project instances) to quantify its scheduling capabilities and limitations. We assess performance from two complementary time-based perspectives: portfolio-level efficiency, measured through total makespan (TMS), and project-level impact, measured through average project delay (APD). We compare the schedules produced by Microsoft Project’s resource-leveling engine with the best-known results from the literature and find systematic overruns with distributional differences across portfolio configurations. These results are not intended as a critique of Microsoft Project, which was never designed as a high-performance optimizer, but as evidence of the performance gap between a widely adopted commercial tool and state-of-the-art heuristics. The findings provide SMEs with empirical insight into the performance of default resource-leveling procedures in multi-project environments and highlight opportunities to transfer academic advances into commercially usable features.

Authors

Institutions

Publication Details

Journal
Central European Journal of Operations Research
Published
2026-09-21
DOI
https://doi.org/10.1007/s10100-026-01042-w
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
article

Baseline performance in multi-project scheduling for SMEs: evidence from microsoft project and MPSPLib

Félix Villafáñez, David J. Poza, Juan De Antón, Agustín Araujo
Central European Journal of Operations Research
Resource-Constrained Project Scheduling
article

Baseline performance in multi-project scheduling for SMEs: evidence from microsoft project and MPSPLib

Félix Villafáñez, David J. Poza, Juan De Antón, Agustín Araujo
article en

Abstract

Small and medium-sized enterprises (SMEs) often manage multiple concurrent projects with limited resources but rely on general-purpose commercial project scheduling software due to affordability and accessibility constraints. While the research community has advanced powerful heuristic algorithms validated on benchmarks, the performance of commercial tools in complex multi-project environments has received little systematic evaluation. This paper evaluates Microsoft Project 2024, considered as a representative example of a widely available general-purpose scheduling tool, on the full MPSPLib benchmark suite (140 multi-project instances) to quantify its scheduling capabilities and limitations. We assess performance from two complementary time-based perspectives: portfolio-level efficiency, measured through total makespan (TMS), and project-level impact, measured through average project delay (APD). We compare the schedules produced by Microsoft Project’s resource-leveling engine with the best-known results from the literature and find systematic overruns with distributional differences across portfolio configurations. These results are not intended as a critique of Microsoft Project, which was never designed as a high-performance optimizer, but as evidence of the performance gap between a widely adopted commercial tool and state-of-the-art heuristics. The findings provide SMEs with empirical insight into the performance of default resource-leveling procedures in multi-project environments and highlight opportunities to transfer academic advances into commercially usable features.

Central European Journal of Operations Research
Universidad de Valladolid (ES)
Industry, innovation and infrastructure
Openalex Percentile: Top 7%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Baseline performance in multi-project scheduling for SMEs: evidence from microsoft project and MPSPLib — Félix Villafáñez, David J. Poza, et al. · Central European Journal of Operations Research (2026) | TGRS Research Map | TGRS