Stage-Conditioned Organization–Data Connections in Collaborative Decision Events: Evidence from a Supertall Building Project

Process-oriented BIM research has documented coordination workflows and design decisions, but project records rarely show how technical evidence becomes a basis for joint judgment and how confirmed outcomes become controlled project information for subsequent tasks. This study develops an auditable event-level framework and applies a retrospective explanatory embedded single-case design to a 266 m mixed-use supertall building. It reconstructs 31 collaborative decision events from 266 evidence fragments across 41 archival records. Within the case, scheme decision-making and specialist design centered on establishing a defensible design basis; design development linked joint review, responsibility assignment, and controlled updates of models, drawings, and issue records to establish a shared cross-disciplinary baseline; and construction detailing and implementation emphasized translating site and procurement changes into the current executable project state. Changed conditions could reopen joint judgment before controlled project information was updated. Comparable events revealed distinct evidentiary discontinuities: analytical outputs were sometimes retained without traceable use in joint judgment, decisions without traceable controlled write-back, and updated records without documentation of the preceding judgment process. Separating these transitions clarifies why similar digital tools and organizational arrangements produce different information outcomes and provides a traceable, stage-conditioned basis for design justification, baseline formation, implementation control, and cross-stage continuity.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2026-09-15
DOI
https://doi.org/10.3390/buildings16183676
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
article

Stage-Conditioned Organization–Data Connections in Collaborative Decision Events: Evidence from a Supertall Building Project

Minfeng Yao, Zhijunjie Zhai, Yu Su, Huiting Lin et al.
Buildings
BIM and Construction Integration
article

Stage-Conditioned Organization–Data Connections in Collaborative Decision Events: Evidence from a Supertall Building Project

Minfeng Yao, Zhijunjie Zhai, Yu Su, Huiting Lin, Qiaoyun Que, Qi Zhang
article en

Abstract

Process-oriented BIM research has documented coordination workflows and design decisions, but project records rarely show how technical evidence becomes a basis for joint judgment and how confirmed outcomes become controlled project information for subsequent tasks. This study develops an auditable event-level framework and applies a retrospective explanatory embedded single-case design to a 266 m mixed-use supertall building. It reconstructs 31 collaborative decision events from 266 evidence fragments across 41 archival records. Within the case, scheme decision-making and specialist design centered on establishing a defensible design basis; design development linked joint review, responsibility assignment, and controlled updates of models, drawings, and issue records to establish a shared cross-disciplinary baseline; and construction detailing and implementation emphasized translating site and procurement changes into the current executable project state. Changed conditions could reopen joint judgment before controlled project information was updated. Comparable events revealed distinct evidentiary discontinuities: analytical outputs were sometimes retained without traceable use in joint judgment, decisions without traceable controlled write-back, and updated records without documentation of the preceding judgment process. Separating these transitions clarifies why similar digital tools and organizational arrangements produce different information outcomes and provides a traceable, stage-conditioned basis for design justification, baseline formation, implementation control, and cross-stage continuity.

BuildingsVol. 16(18)
Huaqiao University (CN), Xiamen University (CN)
Peace, Justice and strong institutions
Openalex Percentile: Top 14%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.