Method of Construction of the Great Pyramid of Khufu: Rolling Blocks and Modular Ramps

This technical paper presents a novel mechanical and logistical hypothesis for the construction of the Great Pyramid of Giza (Khufu). Developed by independent researcher Nicolas Caltagirone, the study challenges traditional static ramp models by introducing a dynamic, scalable infrastructure designed to optimize workforce efficiency and material transport. The proposed methodology relies on two interconnected systems: The Block Rolling Technique: A mechanical framework designed to convert sliding friction into rolling motion, significantly reducing the human traction force required to transport heavy limestone blocks from the quarry to the construction site. The Modular Ramp System: An evolutionary, adaptive ramp design that scales concurrently with the pyramid's elevation. This system allows for the continuous lifting, positioning, and lowering of materials without requiring the colossal volume of a single, static mega-ramp. The document provides preliminary structural concepts, logistical workflows, and mechanical breakdowns illustrating how these methods could be achieved using Old Kingdom technology.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-09-15
DOI
https://doi.org/10.5281/zenodo.22766743
Primary Topic
Ancient Egypt and Archaeology
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
preprint

Method of Construction of the Great Pyramid of Khufu: Rolling Blocks and Modular Ramps

Caltagirone Nicolas
Zenodo (CERN European Organization for Nuclear Research)
Ancient Egypt and Archaeology
preprint

Method of Construction of the Great Pyramid of Khufu: Rolling Blocks and Modular Ramps

Caltagirone Nicolas
preprint en

Abstract

This technical paper presents a novel mechanical and logistical hypothesis for the construction of the Great Pyramid of Giza (Khufu). Developed by independent researcher Nicolas Caltagirone, the study challenges traditional static ramp models by introducing a dynamic, scalable infrastructure designed to optimize workforce efficiency and material transport. The proposed methodology relies on two interconnected systems: The Block Rolling Technique: A mechanical framework designed to convert sliding friction into rolling motion, significantly reducing the human traction force required to transport heavy limestone blocks from the quarry to the construction site. The Modular Ramp System: An evolutionary, adaptive ramp design that scales concurrently with the pyramid's elevation. This system allows for the continuous lifting, positioning, and lowering of materials without requiring the colossal volume of a single, static mega-ramp. The document provides preliminary structural concepts, logistical workflows, and mechanical breakdowns illustrating how these methods could be achieved using Old Kingdom technology.

Zenodo (CERN European Organization for Nuclear Research)
Industry, innovation and infrastructure
Ancient Egypt and Archaeology
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Method of Construction of the Great Pyramid of Khufu: Rolling Blocks and Modular Ramps — Caltagirone Nicolas · Zenodo (CERN European Organization for Nuclear Research) (2026) | TGRS Research Map | TGRS