A Large Language Model-based Agent System for Interactive Large-Scale Project Scheduling

Abstract Advanced optimization techniques generate highly complex schedules for large-scale engineering projects. While large language models have recently emerged as a transformative alternative for project scheduling, two primary hurdles must be overcome to realize a high-precision framework: performance degradation in large-scale projects and the functional separation between planning and analysis. To address these challenges, we propose an on-premises autonomous large language model agent system designed to raise open-source models to a level of accuracy that makes them a practical choice for industrial scheduling. Orchestrated within a LangGraph-based framework that uses the reasoning and acting paradigm, the agent facilitates a virtuous cycle in which plan generation and analytical feedback reinforce each other. To handle large-scale projects accurately, the agent uses a graph retrieval-augmented generation approach that combines local and global search over a knowledge graph of the schedule. It pairs this retrieval with analysis, modification, and optimization tools. Retrieval extracts only the relevant portion of the schedule, while the tools run schedule-wide computations that retrieval alone cannot perform, such as aggregation across all activities in the schedule. In a case study on real-world schedule data, the framework raised the accuracy of open-source backbones to about 90% on the large-scale schedule. By contrast, tool-free baselines struggled regardless of model: open-source models could not fit the schedule within their context window, and even a long-context commercial model (Gemini) reached only 41%. This points to the absence of tools, rather than the context window’s capacity, as the main bottleneck, a finding our component-wise ablation supports. Although this work was evaluated on a single project type at one shipyard, it demonstrates how large language models can become intelligent partners. It also provides a reference point for artificial intelligence-driven support in industrial scheduling and for similar work in other domains.

Authors

Institutions

Publication Details

Journal
Journal of Computational Design and Engineering
Published
2026-09-14
DOI
https://doi.org/10.1093/jcde/qwag082
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
article

A Large Language Model-based Agent System for Interactive Large-Scale Project Scheduling

Haram Seo, Minjoo Choi
Journal of Computational Design and Engineering
Resource-Constrained Project Scheduling
article

A Large Language Model-based Agent System for Interactive Large-Scale Project Scheduling

Haram Seo, Minjoo Choi
article en

Abstract

Abstract Advanced optimization techniques generate highly complex schedules for large-scale engineering projects. While large language models have recently emerged as a transformative alternative for project scheduling, two primary hurdles must be overcome to realize a high-precision framework: performance degradation in large-scale projects and the functional separation between planning and analysis. To address these challenges, we propose an on-premises autonomous large language model agent system designed to raise open-source models to a level of accuracy that makes them a practical choice for industrial scheduling. Orchestrated within a LangGraph-based framework that uses the reasoning and acting paradigm, the agent facilitates a virtuous cycle in which plan generation and analytical feedback reinforce each other. To handle large-scale projects accurately, the agent uses a graph retrieval-augmented generation approach that combines local and global search over a knowledge graph of the schedule. It pairs this retrieval with analysis, modification, and optimization tools. Retrieval extracts only the relevant portion of the schedule, while the tools run schedule-wide computations that retrieval alone cannot perform, such as aggregation across all activities in the schedule. In a case study on real-world schedule data, the framework raised the accuracy of open-source backbones to about 90% on the large-scale schedule. By contrast, tool-free baselines struggled regardless of model: open-source models could not fit the schedule within their context window, and even a long-context commercial model (Gemini) reached only 41%. This points to the absence of tools, rather than the context window’s capacity, as the main bottleneck, a finding our component-wise ablation supports. Although this work was evaluated on a single project type at one shipyard, it demonstrates how large language models can become intelligent partners. It also provides a reference point for artificial intelligence-driven support in industrial scheduling and for similar work in other domains.

Journal of Computational Design and Engineering
Korea Maritime and Ocean University (KR)
Industry, innovation and infrastructure
Openalex Percentile: Top 6%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.