The value of lost load in electricity intensive industry – combining and comparing stated and production value approaches

The value of lost load (VoLL) is a monetary metric quantifying the cost of unsupplied energy (€/kWh) during outages, providing valuable insights for policymakers, utility providers, and industrial stakeholders. Leveraging a mixed-method approach that integrates and compares survey data with publicly available microeconomic data insights, results show how value-added based measures significantly underestimate the financial impact of power outages. Shorter outages are found to be disproportionately costly, primarily due to high fixed costs associated with initial disruptions. Businesses report that the effects of a 1-h outage could linger for months, with some unable to fully recover even 12 months after the event. These extended disruptions underscore the enduring consequences of power outages, particularly for electricity-intensive industries. In a regression type of approach, the cost of power interruptions is not significantly influenced by the type of industry. Instead, the economic impact of an outage is more closely tied to the volume of electricity consumed, duration and production hours. Highlighting sectoral aspects and methodological sensitivities, the paper offers relevant insights for setting reliability standards, designing compensation schemes, and for guiding infrastructure investment.

Authors

Institutions

Publication Details

Journal
Utilities Policy
Published
2026-09-12
DOI
https://doi.org/10.1016/j.jup.2026.102318
Primary Topic
Power System Reliability and Maintenance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
article

The value of lost load in electricity intensive industry – combining and comparing stated and production value approaches

Tommy Lundgren, Lars Persson, Runar Brännlund
Utilities Policy
Power System Reliability and Maintenance
article

The value of lost load in electricity intensive industry – combining and comparing stated and production value approaches

Tommy Lundgren, Lars Persson, Runar Brännlund
article en

Abstract

The value of lost load (VoLL) is a monetary metric quantifying the cost of unsupplied energy (€/kWh) during outages, providing valuable insights for policymakers, utility providers, and industrial stakeholders. Leveraging a mixed-method approach that integrates and compares survey data with publicly available microeconomic data insights, results show how value-added based measures significantly underestimate the financial impact of power outages. Shorter outages are found to be disproportionately costly, primarily due to high fixed costs associated with initial disruptions. Businesses report that the effects of a 1-h outage could linger for months, with some unable to fully recover even 12 months after the event. These extended disruptions underscore the enduring consequences of power outages, particularly for electricity-intensive industries. In a regression type of approach, the cost of power interruptions is not significantly influenced by the type of industry. Instead, the economic impact of an outage is more closely tied to the volume of electricity consumed, duration and production hours. Highlighting sectoral aspects and methodological sensitivities, the paper offers relevant insights for setting reliability standards, designing compensation schemes, and for guiding infrastructure investment.

Utilities PolicyVol. 104
Swedish University of Agricultural Sciences (SE), Umeå University (SE)
Industry, innovation and infrastructure
Openalex Percentile: Top 11%
Power System Reliability and Maintenance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

The value of lost load in electricity intensive industry – combining and comparing stated and production value approaches — Tommy Lundgren, Lars Persson, et al. · Utilities Policy (2026) | TGRS Research Map | TGRS