The Marian Calendar: Design and Evaluation of a Civil Time Architecture for Mars

Human settlement on Mars will require a civil calendar capable of supporting recurring social and organisational activity across a 668–669-sol year. This preprint treats Martian calendrics as a systems-engineering design problem and presents the Marian Calendar, a requirements-informed architecture evaluated against explicit design objectives for astronomical traceability, structural regularity, recurrence invariance, operational cadence and interplanetary legibility. The calendar combines twelve 55–56-sol months with twenty-four 27–28-sol operational subdivisions, six medium-range planning periods and four equal 167-sol common-year quarters. A nominal seven-sol week with shortened terminal weeks gives invariant valid date–weekday relationships. The civil year is referenced to successive Mars passages through Ls = 15°, selected because around a mid-21st-century reference epoch this places Marian New Year close to the heliocentric direction occupied by Earth at Gregorian New Year. A mnemonic 59-in-100 intercalation rule gives a mean civil year of 668.590000 sols. Evaluation over 2031–2120 using JPL Solar System Dynamics planetary-position formulae gives a descriptive Spearman correlation of ρ = 0.9403 between circular Gregorian–Marian month separation and modelled Earth–Mars one-way light time, with the relationship remaining strong across 41 complete synodic cycles. An independent planetary-ephemeris implementation reproduces the headline correlations to better than 4 × 10⁻⁵ in ρ. Marian makes no claim to priority for its 12-month 56–56–55 arithmetic, which is directly preceded by Levitt’s 1954 proposal. Its contribution is to extend the Levitt–Darian structural lineage into a layered civil operating architecture and to evaluate that architecture against explicit settlement design objectives. Preprint status: This is an author preprint and has not undergone peer review. Supporting computational record: Jonathan Bullock, The Marian Calendar: Computational Data and Reproducibility Package, Zenodo, DOI: 10.5281/zenodo.22686413.

Authors

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-09-10
DOI
https://doi.org/10.5281/zenodo.22687143
Primary Topic
Planetary Science and Exploration
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
preprint

The Marian Calendar: Design and Evaluation of a Civil Time Architecture for Mars

Bullock Jonathan
Zenodo (CERN European Organization for Nuclear Research)
Planetary Science and Exploration
preprint

The Marian Calendar: Design and Evaluation of a Civil Time Architecture for Mars

Bullock Jonathan
preprint en

Abstract

Human settlement on Mars will require a civil calendar capable of supporting recurring social and organisational activity across a 668–669-sol year. This preprint treats Martian calendrics as a systems-engineering design problem and presents the Marian Calendar, a requirements-informed architecture evaluated against explicit design objectives for astronomical traceability, structural regularity, recurrence invariance, operational cadence and interplanetary legibility. The calendar combines twelve 55–56-sol months with twenty-four 27–28-sol operational subdivisions, six medium-range planning periods and four equal 167-sol common-year quarters. A nominal seven-sol week with shortened terminal weeks gives invariant valid date–weekday relationships. The civil year is referenced to successive Mars passages through Ls = 15°, selected because around a mid-21st-century reference epoch this places Marian New Year close to the heliocentric direction occupied by Earth at Gregorian New Year. A mnemonic 59-in-100 intercalation rule gives a mean civil year of 668.590000 sols. Evaluation over 2031–2120 using JPL Solar System Dynamics planetary-position formulae gives a descriptive Spearman correlation of ρ = 0.9403 between circular Gregorian–Marian month separation and modelled Earth–Mars one-way light time, with the relationship remaining strong across 41 complete synodic cycles. An independent planetary-ephemeris implementation reproduces the headline correlations to better than 4 × 10⁻⁵ in ρ. Marian makes no claim to priority for its 12-month 56–56–55 arithmetic, which is directly preceded by Levitt’s 1954 proposal. Its contribution is to extend the Levitt–Darian structural lineage into a layered civil operating architecture and to evaluate that architecture against explicit settlement design objectives. Preprint status: This is an author preprint and has not undergone peer review. Supporting computational record: Jonathan Bullock, The Marian Calendar: Computational Data and Reproducibility Package, Zenodo, DOI: 10.5281/zenodo.22686413.

Zenodo (CERN European Organization for Nuclear Research)
University of Hertfordshire (GB), Oldham Council (GB)
Sustainable cities and communities
Planetary Science and Exploration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.