GNSS monitoring and stability evolution mechanism of the S-J1 deformation body in the lower reaches of the Jinsha River

Catastrophic landslides triggered by reservoir impoundment represent one of the most destructive geohazards in the field of hydropower engineering, posing significant threats to human lives, property, and the long-term operational safety of critical infrastructure. A large hydropower station on the lower Jinsha River, ranked as the world’s second-largest hydropower project, with an annual water-level fluctuation of up to 60 m, creates extreme geological conditions that make reservoir bank stability a particularly critical issue. Based on a comprehensive study of the S-J1 deformation body on the reservoir bank of the reservoir area, this paper systematically analyzes its deformation characteristics, formation mechanism, and stability through field investigation, GNSS monitoring, inclinometer measurements, and stability calculations. Results indicate that the deformation body represents a large-scale potential landslide triggered by reservoir impoundment and periodic water-level fluctuations, with an identified sliding surface at depths between 22 m and 34 m. GNSS monitoring records ongoing slow deformation, accompanied by significant local vertical displacement. Stability calculations demonstrate that the slope remains generally stable to marginally stable under natural and rainfall conditions, but becomes unstable under seismic and rapid drawdown conditions, suggesting a high failure risk. Reservoir impoundment is confirmed as the initial triggering factor, while drawdown-induced seepage is identified as the primary driver of ongoing progressive deformation. Mitigation measures including anchor cable reinforcement, surface drainage, and crack sealing are recommended, supported by a long-term monitoring and early warning system. These findings provide theoretical and practical references for identifying and preventing reservoir-induced landslides under analogous engineering geological conditions.

Authors

Institutions

Publication Details

Journal
Environmental Earth Sciences
Published
2026-09-10
DOI
https://doi.org/10.1007/s12665-026-13135-5
Primary Topic
Landslides and related hazards
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

GNSS monitoring and stability evolution mechanism of the S-J1 deformation body in the lower reaches of the Jinsha River

Xiang Wang, Shi Anchi, Que Xiangcheng, Jin Kai et al.
Environmental Earth Sciences
Landslides and related hazards
article

GNSS monitoring and stability evolution mechanism of the S-J1 deformation body in the lower reaches of the Jinsha River

Xiang Wang, Shi Anchi, Que Xiangcheng, Jin Kai, Zhu Shu, An Xingrong, Niu Zihao
article en

Abstract

Catastrophic landslides triggered by reservoir impoundment represent one of the most destructive geohazards in the field of hydropower engineering, posing significant threats to human lives, property, and the long-term operational safety of critical infrastructure. A large hydropower station on the lower Jinsha River, ranked as the world’s second-largest hydropower project, with an annual water-level fluctuation of up to 60 m, creates extreme geological conditions that make reservoir bank stability a particularly critical issue. Based on a comprehensive study of the S-J1 deformation body on the reservoir bank of the reservoir area, this paper systematically analyzes its deformation characteristics, formation mechanism, and stability through field investigation, GNSS monitoring, inclinometer measurements, and stability calculations. Results indicate that the deformation body represents a large-scale potential landslide triggered by reservoir impoundment and periodic water-level fluctuations, with an identified sliding surface at depths between 22 m and 34 m. GNSS monitoring records ongoing slow deformation, accompanied by significant local vertical displacement. Stability calculations demonstrate that the slope remains generally stable to marginally stable under natural and rainfall conditions, but becomes unstable under seismic and rapid drawdown conditions, suggesting a high failure risk. Reservoir impoundment is confirmed as the initial triggering factor, while drawdown-induced seepage is identified as the primary driver of ongoing progressive deformation. Mitigation measures including anchor cable reinforcement, surface drainage, and crack sealing are recommended, supported by a long-term monitoring and early warning system. These findings provide theoretical and practical references for identifying and preventing reservoir-induced landslides under analogous engineering geological conditions.

Environmental Earth SciencesVol. 85(15)
Hohai University (CN), SGIDI Engineering Consulting (China) (CN), Chengdu Surveying Geotechnical Research Institute (CN), Powerchina Huadong Engineering Corporation (China) (CN), Zhejiang University (CN)
Industry, innovation and infrastructure
Openalex Percentile: Top 6%
Landslides and related hazards
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.