Research on the Application of Prefabricated Pavement Slabs in Non-Conventional Natural Gas Drilling Projects

In recent years, traditional cast-in-place concrete construction for pre-drilling engineering in unconventional natural gas fields has generated large amounts of waste concrete, consumed significant resources, and prolonged project schedules. To address these issues, this study proposes a prefabricated pavement slab system as a green and low-carbon alternative. Based on vehicle load surveys at shale-gas well sites in southwestern China, three loading conditions (design, overload, and ultimate axle loads) were defined. Theoretical calculations were then performed for reinforcement design, crack-width control, and local bearing capacity verification. A full-scale precast slab (3000 × 1495 × 150 mm) was fabricated and tested under static monotonic loading to measure deflection, crack development, steel strain, and concrete strain until failure. Separately, a three-dimensional finite element model of a four-panel pavement system (including a mortar-leveling layer and soil subgrade) was developed in ANSYS to simulate static and, preliminarily, moving loads. The experimental slab reached an ultimate load of about 365 kN (based on a single specimen, and thus not statistically representative), with ductile bending failure and crack/deflection patterns typical of reinforced concrete. The numerical model reproduced the cracking load and peak capacity with deviations below 17% from the test data, though post-cracking deflections were underestimated. Overall, the results demonstrate that the proposed prefabricated system is structurally feasible for heavy-duty drilling sites. It enables factory production, rapid on-site assembly, and reuse after dismantling, thereby reducing construction waste, shortening timelines, and supporting energy conservation and emission-reduction goals in the context of China’s green building policies.

Authors

Institutions

Publication Details

Journal
Coatings
Published
2026-09-09
DOI
https://doi.org/10.3390/coatings16091074
Primary Topic
Asphalt Pavement Performance Evaluation
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
article

Research on the Application of Prefabricated Pavement Slabs in Non-Conventional Natural Gas Drilling Projects

Xiaobing Chen, Shucheng Tan, Hua Wen, Hua Tang et al.
Coatings
Asphalt Pavement Performance Evaluation
article

Research on the Application of Prefabricated Pavement Slabs in Non-Conventional Natural Gas Drilling Projects

Xiaobing Chen, Shucheng Tan, Hua Wen, Hua Tang, Binfeng Huang, Xiaoyan Guo
article en

Abstract

In recent years, traditional cast-in-place concrete construction for pre-drilling engineering in unconventional natural gas fields has generated large amounts of waste concrete, consumed significant resources, and prolonged project schedules. To address these issues, this study proposes a prefabricated pavement slab system as a green and low-carbon alternative. Based on vehicle load surveys at shale-gas well sites in southwestern China, three loading conditions (design, overload, and ultimate axle loads) were defined. Theoretical calculations were then performed for reinforcement design, crack-width control, and local bearing capacity verification. A full-scale precast slab (3000 × 1495 × 150 mm) was fabricated and tested under static monotonic loading to measure deflection, crack development, steel strain, and concrete strain until failure. Separately, a three-dimensional finite element model of a four-panel pavement system (including a mortar-leveling layer and soil subgrade) was developed in ANSYS to simulate static and, preliminarily, moving loads. The experimental slab reached an ultimate load of about 365 kN (based on a single specimen, and thus not statistically representative), with ductile bending failure and crack/deflection patterns typical of reinforced concrete. The numerical model reproduced the cracking load and peak capacity with deviations below 17% from the test data, though post-cracking deflections were underestimated. Overall, the results demonstrate that the proposed prefabricated system is structurally feasible for heavy-duty drilling sites. It enables factory production, rapid on-site assembly, and reuse after dismantling, thereby reducing construction waste, shortening timelines, and supporting energy conservation and emission-reduction goals in the context of China’s green building policies.

CoatingsVol. 16(9)
Southwest University of Science and Technology (CN), Chengdu Industrial Equipment Installation (China) (CN), China National Petroleum Corporation (China) (CN)
Openalex Percentile: Top 16%
Asphalt Pavement Performance Evaluation
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.