From pasture to platform integrating agrivoltaics and green hydrogen for the Penzance–London railway corridor

Decarbonising heavy-duty transport, particularly rail, is critical to the UK’s 2050 net-zero target. This study assesses the feasibility of a green-hydrogen-powered rail system fuelled by agrivoltaics (APV), combining solar generation from APV, train-rooftop photovoltaics, and track-integrated photovoltaics (TIPV). QGIS determined optimal APV siting relative to rail infrastructure, with the Decision Support System for Agrotechnology Transfer (DSSAT), PVsyst and HOMER Pro coupled to evaluate agricultural, energy, and economic performance. The London Paddington to Penzance route was modelled using a 9-car Class-800 hydrogen train (8,080.9 kWh per leg, 440.8 kg of compressed hydrogen per journey, 7,053.1 kg daily fleet demand). Using existing overhead electrification between London and Newbury reduces annual electrical demand by 11% to 132.27 GWh, requiring 2,290 tonnes of green hydrogen annually. A 114.4 MWp APV array at Long Rock Depot, covering 198.3 ha, meets this demand, generating 151.00 GWh annually. DSSAT modelling showed faba bean yield rising by 66% at 30% ground coverage ratio (GCR), while sugar beet yield declined steadily with increasing GCR, indicating that agrivoltaic compatibility is crop-dependent rather than universal. HOMER Pro identified only a grid-supplemented architecture as commercially defensible: CAPEX £161.7 M, lifecycle net present cost (NPC) £263.1 M, IRR 18.39%, 5.41-year payback, and a levelised cost of hydrogen (LCOH) of £7.99/kg. Track- and vehicle-integrated photovoltaics both proved energetically marginal against real traction demand. Seasonal hydrogen storage, while technically feasible, was economically unviable, with LCOH rising to £28.11/kg. Seawater desalination was identified as the preferred water feedstock, avoiding conflict with domestic supply.

Authors

Institutions

Publication Details

Journal
Solar Energy
Published
2026-09-06
DOI
https://doi.org/10.1016/j.solener.2026.115064
Primary Topic
Hybrid Renewable Energy Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

From pasture to platform integrating agrivoltaics and green hydrogen for the Penzance–London railway corridor

Aritra Ghosh, Henry Betts, Shanza Neda Hussain, Mohamed Al Mandhari et al.
Solar Energy
Hybrid Renewable Energy Systems
article

From pasture to platform integrating agrivoltaics and green hydrogen for the Penzance–London railway corridor

Aritra Ghosh, Henry Betts, Shanza Neda Hussain, Mohamed Al Mandhari, Charlotte Sanders
article en

Abstract

Decarbonising heavy-duty transport, particularly rail, is critical to the UK’s 2050 net-zero target. This study assesses the feasibility of a green-hydrogen-powered rail system fuelled by agrivoltaics (APV), combining solar generation from APV, train-rooftop photovoltaics, and track-integrated photovoltaics (TIPV). QGIS determined optimal APV siting relative to rail infrastructure, with the Decision Support System for Agrotechnology Transfer (DSSAT), PVsyst and HOMER Pro coupled to evaluate agricultural, energy, and economic performance. The London Paddington to Penzance route was modelled using a 9-car Class-800 hydrogen train (8,080.9 kWh per leg, 440.8 kg of compressed hydrogen per journey, 7,053.1 kg daily fleet demand). Using existing overhead electrification between London and Newbury reduces annual electrical demand by 11% to 132.27 GWh, requiring 2,290 tonnes of green hydrogen annually. A 114.4 MWp APV array at Long Rock Depot, covering 198.3 ha, meets this demand, generating 151.00 GWh annually. DSSAT modelling showed faba bean yield rising by 66% at 30% ground coverage ratio (GCR), while sugar beet yield declined steadily with increasing GCR, indicating that agrivoltaic compatibility is crop-dependent rather than universal. HOMER Pro identified only a grid-supplemented architecture as commercially defensible: CAPEX £161.7 M, lifecycle net present cost (NPC) £263.1 M, IRR 18.39%, 5.41-year payback, and a levelised cost of hydrogen (LCOH) of £7.99/kg. Track- and vehicle-integrated photovoltaics both proved energetically marginal against real traction demand. Seasonal hydrogen storage, while technically feasible, was economically unviable, with LCOH rising to £28.11/kg. Seawater desalination was identified as the preferred water feedstock, avoiding conflict with domestic supply.

Solar EnergyVol. 318
University of Exeter (GB)
Industry, innovation and infrastructure
Openalex Percentile: Top 23%
Hybrid Renewable Energy Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.