Planning energy adequacy for a renewable New England: Multi-decade weather, short- and long-duration storage, and grid-interactive electric vehicles

This study evaluates how planning horizon length, storage technology mix, and firm capacity affect resource adequacy in a high-renewable New England electricity system. Using 44 years of hourly wind, solar, and demand data, the analysis optimizes least-cost portfolios under different historical planning windows and tests their adequacy across the full multi-decadal record. Extending the planning horizon from 1 to 44 years reduces expected unserved energy (EUE) by up to 98% and loss-of-load hours (LOLH) by more than 90%, though at an average 5–10% increase in total system cost. Systems relying only on short-duration energy storage (SDES) or those incorporating long-duration energy storage (LDES) such as hydrogen power-to-gas-to-power and redox-flow batteries required more than 44 years of planning data to achieve full adequacy, while those with firm capacity (natural gas) present, archived 100% adequacy with 21 years of data. LDES also lowers the marginal cost of avoided lost load (MCALL) to below 10 $/kWh, maintaining economic efficiency even at high reliability levels. Introducing a 5% firm-capacity backstop further improves adequacy and lowers cost, particularly when the planning horizon underrepresents extreme renewable droughts. Under full electric-vehicle electrification, results showed that allowing natural gas to supply even a small fraction of annual demand offset additional capacity needs and improve adequacy outcomes. The findings show that representing at least two decades of historical climate variability and combining LDES, limited firm resources, and flexible electrification are essential for cost-effective adequacy planning in a deeply decarbonized New England grid.

Authors

Institutions

Publication Details

Journal
Next Energy
Published
2026-08-27
DOI
https://doi.org/10.1016/j.nxener.2026.100939
Primary Topic
Electric Vehicles and Infrastructure
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Planning energy adequacy for a renewable New England: Multi-decade weather, short- and long-duration storage, and grid-interactive electric vehicles

Ertan Ağar, S. A. Freeman
Next Energy
Electric Vehicles and Infrastructure
article

Planning energy adequacy for a renewable New England: Multi-decade weather, short- and long-duration storage, and grid-interactive electric vehicles

Ertan Ağar, S. A. Freeman
article en

Abstract

This study evaluates how planning horizon length, storage technology mix, and firm capacity affect resource adequacy in a high-renewable New England electricity system. Using 44 years of hourly wind, solar, and demand data, the analysis optimizes least-cost portfolios under different historical planning windows and tests their adequacy across the full multi-decadal record. Extending the planning horizon from 1 to 44 years reduces expected unserved energy (EUE) by up to 98% and loss-of-load hours (LOLH) by more than 90%, though at an average 5–10% increase in total system cost. Systems relying only on short-duration energy storage (SDES) or those incorporating long-duration energy storage (LDES) such as hydrogen power-to-gas-to-power and redox-flow batteries required more than 44 years of planning data to achieve full adequacy, while those with firm capacity (natural gas) present, archived 100% adequacy with 21 years of data. LDES also lowers the marginal cost of avoided lost load (MCALL) to below 10 $/kWh, maintaining economic efficiency even at high reliability levels. Introducing a 5% firm-capacity backstop further improves adequacy and lowers cost, particularly when the planning horizon underrepresents extreme renewable droughts. Under full electric-vehicle electrification, results showed that allowing natural gas to supply even a small fraction of annual demand offset additional capacity needs and improve adequacy outcomes. The findings show that representing at least two decades of historical climate variability and combining LDES, limited firm resources, and flexible electrification are essential for cost-effective adequacy planning in a deeply decarbonized New England grid.

Next EnergyVol. 13
University of Massachusetts Lowell (US)
National Grid Gas Transmission
Climate action
Openalex Percentile: Top 19%
Electric Vehicles and Infrastructure
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.