Fuzzy 5D multi objectives optimization of construction planning using game theory for automated time cost quality resource and workspace resolution

Purpose This study aims to develop a five-dimensional (5D) optimization framework to resolve spatial and resource conflicts in construction scheduling. By integrating resource leveling and workspace congestion with the traditional time, cost and quality objectives, the research addresses the critical gap between theoretical scheduling models and practical site feasibility. Design/methodology/approach The framework uses triangular fuzzy numbers to model uncertainties in activity durations and costs. A Nondominated Sorting Genetic Algorithm III (NSGA-III) generates a comprehensive Pareto front for a complex highway interchange. To eliminate subjective bias in schedule selection, the methodology integrates cooperative game theory. An entropy-weighted nash Bargaining mechanism automatically evaluates the competing objectives to identify the optimal compromise. Findings The application of this framework demonstrates that integrating spatial and resource constraints substantially alters optimal execution paths. The Nash-derived schedule reduced spatial conflicts by nearly 38%, duration by 6.53%, and cost by 8.42% compared to standard practices. Variance analysis across 30 independent runs confirmed the statistical significance of these improvements, proving the model consistently outperforms conventional single-objective and multi objective baselines. Originality/value The primary contribution is a data-driven workflow that objectively resolves high-dimensional stakeholder conflicts. By leveraging game-theoretic principles, the framework provides an automated mechanism to secure balanced, mathematically fair schedules, mitigating the operational risks of trade stacking and severe resource peaks.

Authors

Institutions

Publication Details

Journal
Journal of Engineering Design and Technology
Published
2026-08-25
DOI
https://doi.org/10.1108/jedt-05-2026-0345
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Fuzzy 5D multi objectives optimization of construction planning using game theory for automated time cost quality resource and workspace resolution

Amr Ashraf Mohy, Haytham Sanad
Journal of Engineering Design and Technology
Resource-Constrained Project Scheduling
article

Fuzzy 5D multi objectives optimization of construction planning using game theory for automated time cost quality resource and workspace resolution

Amr Ashraf Mohy, Haytham Sanad
article en

Abstract

Purpose This study aims to develop a five-dimensional (5D) optimization framework to resolve spatial and resource conflicts in construction scheduling. By integrating resource leveling and workspace congestion with the traditional time, cost and quality objectives, the research addresses the critical gap between theoretical scheduling models and practical site feasibility. Design/methodology/approach The framework uses triangular fuzzy numbers to model uncertainties in activity durations and costs. A Nondominated Sorting Genetic Algorithm III (NSGA-III) generates a comprehensive Pareto front for a complex highway interchange. To eliminate subjective bias in schedule selection, the methodology integrates cooperative game theory. An entropy-weighted nash Bargaining mechanism automatically evaluates the competing objectives to identify the optimal compromise. Findings The application of this framework demonstrates that integrating spatial and resource constraints substantially alters optimal execution paths. The Nash-derived schedule reduced spatial conflicts by nearly 38%, duration by 6.53%, and cost by 8.42% compared to standard practices. Variance analysis across 30 independent runs confirmed the statistical significance of these improvements, proving the model consistently outperforms conventional single-objective and multi objective baselines. Originality/value The primary contribution is a data-driven workflow that objectively resolves high-dimensional stakeholder conflicts. By leveraging game-theoretic principles, the framework provides an automated mechanism to secure balanced, mathematically fair schedules, mitigating the operational risks of trade stacking and severe resource peaks.

Journal of Engineering Design and Technology
Tanta University (EG), Arab Academy for Science, Technology, and Maritime Transport (EG)
Openalex Percentile: Top 6%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Fuzzy 5D multi objectives optimization of construction planning using game theory for automated time cost quality resource and workspace resolution — Amr Ashraf Mohy, Haytham Sanad · Journal of Engineering Design and Technology (2026) | TGRS Research Map | TGRS