Error in Response of a Linear Reservoir in Comparison with That of a Nonlinear Reservoir

Abstract Linear and nonlinear reservoirs have been widely used in hydrology, especially in rainfall-runoff modeling, flow routing, and groundwater flow. Although hydrologic processes are nonlinear, it is often assumed that a linear reservoir is a good approximation of a nonlinear reservoir. That is why a linear reservoir forms the basis of the unit hydrograph theory. The question, however, is: How accurately the linear reservoir approximates the nonlinear reservoir. Normally, the approximation is measured by one metric for the entire hydrograph, such as root mean square error, efficiency criterion, and correlation coefficient. The objective of this study is to derive the graph of error for the entire hydrograph. This graph shows the error as a function of time, demonstrating that the error is not constant in time and may vary from one discharge value of the hydrograph to another.

Authors

Institutions

Publication Details

Journal
Journal of Hydrologic Engineering
Published
2026-08-25
DOI
https://doi.org/10.1061/jhyeff.heeng-6925
Primary Topic
Hydrology and Watershed Management Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Error in Response of a Linear Reservoir in Comparison with That of a Nonlinear Reservoir

Qiong Su, Vijay P. Singh
Journal of Hydrologic Engineering
Hydrology and Watershed Management Studies
article

Error in Response of a Linear Reservoir in Comparison with That of a Nonlinear Reservoir

Qiong Su, Vijay P. Singh
article en

Abstract

Abstract Linear and nonlinear reservoirs have been widely used in hydrology, especially in rainfall-runoff modeling, flow routing, and groundwater flow. Although hydrologic processes are nonlinear, it is often assumed that a linear reservoir is a good approximation of a nonlinear reservoir. That is why a linear reservoir forms the basis of the unit hydrograph theory. The question, however, is: How accurately the linear reservoir approximates the nonlinear reservoir. Normally, the approximation is measured by one metric for the entire hydrograph, such as root mean square error, efficiency criterion, and correlation coefficient. The objective of this study is to derive the graph of error for the entire hydrograph. This graph shows the error as a function of time, demonstrating that the error is not constant in time and may vary from one discharge value of the hydrograph to another.

Journal of Hydrologic EngineeringVol. 31(6)
Mitchell Institute (US), Clemson University (US)
Clean water and sanitation
Openalex Percentile: Top 19%
Hydrology and Watershed Management Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Error in Response of a Linear Reservoir in Comparison with That of a Nonlinear Reservoir — Qiong Su, Vijay P. Singh · Journal of Hydrologic Engineering (2026) | TGRS Research Map | TGRS