Clash Categorization and Optimization in a Federated BIM Workflow for Integrating Temporary Shoring Systems and Permanent Structures in High-Rise Excavations

The integration of temporary support systems with permanent structural frameworks remains a complex challenge in high-rise construction, where traditional building information modeling (BIM) workflows often lack the coordination needed to optimize both simultaneously. This study addresses that gap through a federated BIM workflow using Tekla Structures, Revit, Navisworks, and Dynamo on a fourteen-story building with a five-level basement. The temporary shoring, permanent concrete frame, and formwork were modeled at Level of Development (LOD) 300–350. A parameter-driven methodology in Dynamo managed large-scale clash detection. Steel cutting-list optimization reduced sheet-cutting waste from 4.5% to below 3% across 18 tons of steel. Clash detection between the truss guard and permanent rebar initially returned over 6000 conflicts; categorizing these via Dynamo made resolution tractable. This data optimized plywood formwork, reducing requirements by 15% (3350 to 2850 square meters), and refined rebar scheduling, recovering 51 of 103 additional tons, 32.8 tons of which are directly attributable to the truss-rebar interaction-zone workflow presented in this study. The study demonstrates that federating temporary and permanent models generates reusable coordination data, yielding savings beyond simple clash avoidance. It offers a transferable workflow for temporary-to-permanent structural integration that the current literature has not yet examined quantitatively.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2026-08-18
DOI
https://doi.org/10.3390/buildings16163290
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Clash Categorization and Optimization in a Federated BIM Workflow for Integrating Temporary Shoring Systems and Permanent Structures in High-Rise Excavations

Sahar Falegari, Ali Akbar Shirzadi Javid, Mohammadsoroush Tafazzoli
Buildings
BIM and Construction Integration
article

Clash Categorization and Optimization in a Federated BIM Workflow for Integrating Temporary Shoring Systems and Permanent Structures in High-Rise Excavations

Sahar Falegari, Ali Akbar Shirzadi Javid, Mohammadsoroush Tafazzoli
article en

Abstract

The integration of temporary support systems with permanent structural frameworks remains a complex challenge in high-rise construction, where traditional building information modeling (BIM) workflows often lack the coordination needed to optimize both simultaneously. This study addresses that gap through a federated BIM workflow using Tekla Structures, Revit, Navisworks, and Dynamo on a fourteen-story building with a five-level basement. The temporary shoring, permanent concrete frame, and formwork were modeled at Level of Development (LOD) 300–350. A parameter-driven methodology in Dynamo managed large-scale clash detection. Steel cutting-list optimization reduced sheet-cutting waste from 4.5% to below 3% across 18 tons of steel. Clash detection between the truss guard and permanent rebar initially returned over 6000 conflicts; categorizing these via Dynamo made resolution tractable. This data optimized plywood formwork, reducing requirements by 15% (3350 to 2850 square meters), and refined rebar scheduling, recovering 51 of 103 additional tons, 32.8 tons of which are directly attributable to the truss-rebar interaction-zone workflow presented in this study. The study demonstrates that federating temporary and permanent models generates reusable coordination data, yielding savings beyond simple clash avoidance. It offers a transferable workflow for temporary-to-permanent structural integration that the current literature has not yet examined quantitatively.

BuildingsVol. 16(16)
Georgia Southern University (US), Iran University of Science and Technology (IR)
Sustainable cities and communities
Openalex Percentile: Top 13%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Clash Categorization and Optimization in a Federated BIM Workflow for Integrating Temporary Shoring Systems and Permanent Structures in High-Rise Excavations — Sahar Falegari, Ali Akbar Shirzadi Javid, et al. · Buildings (2026) | TGRS Research Map | TGRS