Coordinated Operation and Stability Limits of Grid-Forming and Grid-Following Inverters in Power System Restoration

As power systems transition from synchronous generation towards inverter-based resources (IBRs), these resources will increasingly need to provide black-start and power system restoration services. This paper evaluates the transient interactions and stability limits of coordinated grid-forming (GFM) and grid-following (GFL) inverter operation during a bottom-up restoration process. Using a parallel–sequential restoration strategy, restoration of the main transmission backbone and formation of a local restoration island with high GFL penetration proceed in parallel, while the energisation events within each restoration path are carried out sequentially, in a modified IEEE 9-bus test system. Electromagnetic transient (EMT) simulations are used to identify the maximum tested stable operating point of the restoration island as GFL capacity is progressively increased. The simulation results demonstrate that, for the studied system and operating conditions, a single 10 MW GFM anchor can maintain stable island operation with up to 110 MW of aggregate GFL capacity, corresponding to a GFM-to-GFL capacity ratio of 1:11. When the aggregate GFL capacity is increased to 120 MW, corresponding to the next tested ratio of 1:12, the restoration island becomes unstable, with the observed instability associated with loss of synchronisation in the GFL phase-locked loops (PLLs). At the 1:11 operating point, the corresponding equivalent short-circuit ratio (ESCR) is 2.5, indicating weak-grid conditions. Finally, the 1:11 restoration island is successfully resynchronised with the main grid, with active power, frequency, and PCC voltage recovering within approximately 1.5 s following the switching events.

Authors

Institutions

Publication Details

Journal
Energies
Published
2026-08-18
DOI
https://doi.org/10.3390/en19163875
Primary Topic
Microgrid Control and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Coordinated Operation and Stability Limits of Grid-Forming and Grid-Following Inverters in Power System Restoration

Alex Stojcevski, Mohammad Kamran Ikram, Mehdi Seyedmahmoudian, Saad Mekhilef et al.
Energies
Microgrid Control and Optimization
article

Coordinated Operation and Stability Limits of Grid-Forming and Grid-Following Inverters in Power System Restoration

Alex Stojcevski, Mohammad Kamran Ikram, Mehdi Seyedmahmoudian, Saad Mekhilef, Pooyan Alinaghi Hosseinabadi
article en

Abstract

As power systems transition from synchronous generation towards inverter-based resources (IBRs), these resources will increasingly need to provide black-start and power system restoration services. This paper evaluates the transient interactions and stability limits of coordinated grid-forming (GFM) and grid-following (GFL) inverter operation during a bottom-up restoration process. Using a parallel–sequential restoration strategy, restoration of the main transmission backbone and formation of a local restoration island with high GFL penetration proceed in parallel, while the energisation events within each restoration path are carried out sequentially, in a modified IEEE 9-bus test system. Electromagnetic transient (EMT) simulations are used to identify the maximum tested stable operating point of the restoration island as GFL capacity is progressively increased. The simulation results demonstrate that, for the studied system and operating conditions, a single 10 MW GFM anchor can maintain stable island operation with up to 110 MW of aggregate GFL capacity, corresponding to a GFM-to-GFL capacity ratio of 1:11. When the aggregate GFL capacity is increased to 120 MW, corresponding to the next tested ratio of 1:12, the restoration island becomes unstable, with the observed instability associated with loss of synchronisation in the GFL phase-locked loops (PLLs). At the 1:11 operating point, the corresponding equivalent short-circuit ratio (ESCR) is 2.5, indicating weak-grid conditions. Finally, the 1:11 restoration island is successfully resynchronised with the main grid, with active power, frequency, and PCC voltage recovering within approximately 1.5 s following the switching events.

EnergiesVol. 19(16)
University of Tasmania (AU), Swinburne University of Technology (AU), Singapore University of Social Sciences (SG)
Openalex Percentile: Top 13%
Microgrid Control and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.