Postaward Contract Administration in an EPC Hydropower Project: Key Challenges, Disputes, and Lessons Learned

Abstract The use of the design-build (DB) and/or engineering, procurement, construction (EPC) project delivery method is rapidly increasing in the public sector. Whereas DB/EPC has been widely and successfully used to deliver infrastructure projects mainly in the United States and Asia, its application in sub-Saharan Africa remains underdocumented, with numerous challenges still to be addressed. One significant challenge is the effective administration of contracts during the construction phase. To bridge this knowledge gap, this paper presents a case study of a hydropower project in Uganda delivered using the EPC method. It explores key challenges and lessons learned from the owner’s perspective during the postaward construction contract administration (PACCA) phase. The study methodology consisted of performing a literature review, analysis of project documentation, site visits, direct observation during meetings, and semistructured interviews with key personnel from the owner’s project team and industry experts. EPC contract administration challenges were examined under seven categories. The key challenges were found to include the owner’s limited experience with the delivery method, inadequate site supervision, change orders’ mismanagement, incomplete and ambiguous performance criteria, poor documentation and record management, and premature issuance of the certificate for substantial completion. The lessons learned aim to enhance PACCA practices in developing countries, particularly for public agencies in sub-Saharan Africa working with international contractors on EPC projects.

Authors

Institutions

Publication Details

Journal
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Published
2026-08-18
DOI
https://doi.org/10.1061/jladah.ladr-1603
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Postaward Contract Administration in an EPC Hydropower Project: Key Challenges, Disputes, and Lessons Learned

Harrison E. Mutikanga, Mohamed-Asem Uthman Abdul-Malak, Farah S. Demachkieh, M. Kayondo
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Construction Project Management and Performance
article

Postaward Contract Administration in an EPC Hydropower Project: Key Challenges, Disputes, and Lessons Learned

Harrison E. Mutikanga, Mohamed-Asem Uthman Abdul-Malak, Farah S. Demachkieh, M. Kayondo
article en

Abstract

Abstract The use of the design-build (DB) and/or engineering, procurement, construction (EPC) project delivery method is rapidly increasing in the public sector. Whereas DB/EPC has been widely and successfully used to deliver infrastructure projects mainly in the United States and Asia, its application in sub-Saharan Africa remains underdocumented, with numerous challenges still to be addressed. One significant challenge is the effective administration of contracts during the construction phase. To bridge this knowledge gap, this paper presents a case study of a hydropower project in Uganda delivered using the EPC method. It explores key challenges and lessons learned from the owner’s perspective during the postaward construction contract administration (PACCA) phase. The study methodology consisted of performing a literature review, analysis of project documentation, site visits, direct observation during meetings, and semistructured interviews with key personnel from the owner’s project team and industry experts. EPC contract administration challenges were examined under seven categories. The key challenges were found to include the owner’s limited experience with the delivery method, inadequate site supervision, change orders’ mismanagement, incomplete and ambiguous performance criteria, poor documentation and record management, and premature issuance of the certificate for substantial completion. The lessons learned aim to enhance PACCA practices in developing countries, particularly for public agencies in sub-Saharan Africa working with international contractors on EPC projects.

Journal of Legal Affairs and Dispute Resolution in Engineering and ConstructionVol. 18(4)
Central Electricity Generating Board (GB), American University of Beirut (LB)
Openalex Percentile: Top 6%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Postaward Contract Administration in an EPC Hydropower Project: Key Challenges, Disputes, and Lessons Learned — Harrison E. Mutikanga, Mohamed-Asem Uthman Abdul-Malak, et al. · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction (2026) | TGRS Research Map | TGRS