Model Test on the Multi-Effects of Tunneling and Excavation upon an Existing Pile in Clay

Existing studies often analyze tunnels and excavations as isolated projects, but in practice they are often constructed sequentially or simultaneously. This paper investigates their combined effects on adjacent pile foundations in clay using constant-gravity model tests and 3D numerical methods, considering time-dependent clay behavior and small-strain stiffness. Two combined construction sequences of tunnelling and excavation adjacent to an existing pile were investigated: (i) tunnel excavation followed by basement excavation (i.e., test TEP); (ii) basement excavation followed by tunnel excavation (i.e., test ETP). Results show that construction sequence has little effect on surface settlement but significantly influences pile response. Pile top settlement increases considerably when tunnelling occurs near piles. The TEP sequence reduces cumulative pile top settlement by 0.38% of the pile diameter and reduces the maximum cumulative bending moment by approximately 31% compared with the ETP sequence. Additionally, tunnel and excavation construction generate negative excess pore water pressure in the surrounding soil, which dissipates over time. The pressure increases with proximity to the tunnel face or excavation base.

Authors

Institutions

Publication Details

Journal
Materials
Published
2026-08-14
DOI
https://doi.org/10.3390/ma19163453
Primary Topic
Geotechnical Engineering and Analysis
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Model Test on the Multi-Effects of Tunneling and Excavation upon an Existing Pile in Clay

Qiang Li, Hongguo Diao, Xinquan Wang, Yuhao Lu et al.
Materials
Geotechnical Engineering and Analysis
article

Model Test on the Multi-Effects of Tunneling and Excavation upon an Existing Pile in Clay

Qiang Li, Hongguo Diao, Xinquan Wang, Yuhao Lu, Zhiwei Zhou, Hanmei Luo, Haibo Hu, Gang Wei
article en

Abstract

Existing studies often analyze tunnels and excavations as isolated projects, but in practice they are often constructed sequentially or simultaneously. This paper investigates their combined effects on adjacent pile foundations in clay using constant-gravity model tests and 3D numerical methods, considering time-dependent clay behavior and small-strain stiffness. Two combined construction sequences of tunnelling and excavation adjacent to an existing pile were investigated: (i) tunnel excavation followed by basement excavation (i.e., test TEP); (ii) basement excavation followed by tunnel excavation (i.e., test ETP). Results show that construction sequence has little effect on surface settlement but significantly influences pile response. Pile top settlement increases considerably when tunnelling occurs near piles. The TEP sequence reduces cumulative pile top settlement by 0.38% of the pile diameter and reduces the maximum cumulative bending moment by approximately 31% compared with the ETP sequence. Additionally, tunnel and excavation construction generate negative excess pore water pressure in the surrounding soil, which dissipates over time. The pressure increases with proximity to the tunnel face or excavation base.

MaterialsVol. 19(16)
PowerChina (China) (CN), Powerchina Huadong Engineering Corporation (China) (CN), Hangzhou City University, Zhejiang University (CN)
National Natural Science Foundation of China
Sustainable cities and communities
Openalex Percentile: Top 10%
Geotechnical Engineering and Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Model Test on the Multi-Effects of Tunneling and Excavation upon an Existing Pile in Clay — Qiang Li, Hongguo Diao, et al. · Materials (2026) | TGRS Research Map | TGRS