Transient behavior analysis of the intermediate-circuit-balanced HCPB fusion power plant

The HCPB concept of the EU-DEMO fusion power plant uses helium cooling of the reactor, operated in pulsed mode due to inductive current drive. Since conventional Rankine steam cycle power generation does not allow for pulsed operation, the thermal power must be balanced. For this reason, an intermediate circuit with molten salt thermal storage tanks is used. This circuit acts as a thermal buffer and is designed to stabilize the heat input to the steam generators and steam superheaters. In this paper, the transient behavior of the assembly of the primary heat transfer system, the intermediate heat transfer system, and the steam production for the power conversion system (PCS) is analyzed. A specialized system code has been developed to study the transient behavior of such a thermodynamic system.

Authors

Institutions

Publication Details

Journal
Fusion Engineering and Design
Published
2026-08-14
DOI
https://doi.org/10.1016/j.fusengdes.2026.115997
Primary Topic
Magnetic confinement fusion research
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Transient behavior analysis of the intermediate-circuit-balanced HCPB fusion power plant

Pavel Zácha, Slavomír Entler, Jan Štěpánek, Jan Loskot
Fusion Engineering and Design
Magnetic confinement fusion research
article

Transient behavior analysis of the intermediate-circuit-balanced HCPB fusion power plant

Pavel Zácha, Slavomír Entler, Jan Štěpánek, Jan Loskot
article en

Abstract

The HCPB concept of the EU-DEMO fusion power plant uses helium cooling of the reactor, operated in pulsed mode due to inductive current drive. Since conventional Rankine steam cycle power generation does not allow for pulsed operation, the thermal power must be balanced. For this reason, an intermediate circuit with molten salt thermal storage tanks is used. This circuit acts as a thermal buffer and is designed to stabilize the heat input to the steam generators and steam superheaters. In this paper, the transient behavior of the assembly of the primary heat transfer system, the intermediate heat transfer system, and the steam production for the power conversion system (PCS) is analyzed. A specialized system code has been developed to study the transient behavior of such a thermodynamic system.

Fusion Engineering and DesignVol. 232
Czech Academy of Sciences, Institute of Plasma Physics (CZ), Czech Technical University in Prague (CZ), University of Chemistry and Technology, Prague (CZ)
Technologická Agentura České Republiky, Akademie Věd České Republiky
Affordable and clean energy
Openalex Percentile: Top 12%
Magnetic confinement fusion research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Transient behavior analysis of the intermediate-circuit-balanced HCPB fusion power plant — Pavel Zácha, Slavomír Entler, et al. · Fusion Engineering and Design (2026) | TGRS Research Map | TGRS