Short-term consequences of Baltic offshore energy system construction for the Harbour Porpoise

By exploiting the immense offshore wind resources, Denmark’s planned Energy Islands are forecasted to provide 5 GW of power, with long-term expansion potential to 10 GW. This study focused on the endangered Baltic Sea Harbour Porpoise population of 500 mammals. This study addresses a gap in the literature: existing agency assessments assume “soft start” makes noise insignificant, but this has not been tested for a critically endangered resident population at 0 km from protected habitats. It was found that based on the expected noise emissions, permanent hearing damage could be caused within a distance of 200–840 m and behavioural changes of the mammals up to 11 km away. Critically, the two planned offshore wind farms are situated adjacent to three Natura 2000 protected habitats, with the Rønne Banke and Adlergrund area located at a distance of 0 km from both development sites. The analysis revealed that while the Danish Energy Agency considers noise emissions insignificant if soft start/ramp up procedures are applied, the actual impact is dependent on variable factors including foundation type, soil conditions, and pile diameter—none of which have been finalized. Furthermore, the application of mitigation measures such as restricting construction to low-prevalence periods presents an inherent trade-off by prolonging overall installation duration and potentially creating chronic disturbance. However, restricting construction to low-prevalence periods creates a trade-off: reduced peak noise versus prolonged disturbance duration. For this resident critically endangered population, prolonged low-level disturbance may be biologically worse than short intense disturbance, as it risks chronic habitat abandonment without a clear return trigger.

Authors

Institutions

Publication Details

Journal
Discover Energy
Published
2026-08-14
DOI
https://doi.org/10.1007/s43937-026-00181-0
Primary Topic
Wave and Wind Energy Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Short-term consequences of Baltic offshore energy system construction for the Harbour Porpoise

A. Sotiropoulos, George Xydis, Camilla Weidick-Kristensen
Discover Energy
Wave and Wind Energy Systems
article

Short-term consequences of Baltic offshore energy system construction for the Harbour Porpoise

A. Sotiropoulos, George Xydis, Camilla Weidick-Kristensen
article en

Abstract

By exploiting the immense offshore wind resources, Denmark’s planned Energy Islands are forecasted to provide 5 GW of power, with long-term expansion potential to 10 GW. This study focused on the endangered Baltic Sea Harbour Porpoise population of 500 mammals. This study addresses a gap in the literature: existing agency assessments assume “soft start” makes noise insignificant, but this has not been tested for a critically endangered resident population at 0 km from protected habitats. It was found that based on the expected noise emissions, permanent hearing damage could be caused within a distance of 200–840 m and behavioural changes of the mammals up to 11 km away. Critically, the two planned offshore wind farms are situated adjacent to three Natura 2000 protected habitats, with the Rønne Banke and Adlergrund area located at a distance of 0 km from both development sites. The analysis revealed that while the Danish Energy Agency considers noise emissions insignificant if soft start/ramp up procedures are applied, the actual impact is dependent on variable factors including foundation type, soil conditions, and pile diameter—none of which have been finalized. Furthermore, the application of mitigation measures such as restricting construction to low-prevalence periods presents an inherent trade-off by prolonging overall installation duration and potentially creating chronic disturbance. However, restricting construction to low-prevalence periods creates a trade-off: reduced peak noise versus prolonged disturbance duration. For this resident critically endangered population, prolonged low-level disturbance may be biologically worse than short intense disturbance, as it risks chronic habitat abandonment without a clear return trigger.

Discover Energy
University of Peloponnese (GR), National Technical University of Athens (GR), Aarhus University (DK)
Affordable and clean energy
Openalex Percentile: Top 13%
Wave and Wind Energy Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Short-term consequences of Baltic offshore energy system construction for the Harbour Porpoise — A. Sotiropoulos, George Xydis, et al. · Discover Energy (2026) | TGRS Research Map | TGRS