AI-Enabled Performance-Based Procurement and Life-Cycle Maintenance of Highway Bridges: Integrating Single-Bid Risk Analytics and PPP Payment Optimization

Abstract Aging bridges, tight budgets, and procurement inefficiencies require a data-driven approach to maintenance contracts. Existing evidence shows that information and communication technology (ICT)–based construction management improves site productivity but remains unevenly adopted, a significant percentage of consultant tenders were single bid with systematically higher award rates, and public–private partnership (PPP) models for bridges that use Markovian deterioration modeling and performance-based payments can incentivize preventive maintenance, but they remain sensitive to prediction errors. Building on these strands, we propose an artificial intelligence (AI)–enabled framework that predicts the risk and cost impact of single-bid procurement, forecasts bridge condition trajectories using ICT-derived inspection and monitoring data, and optimizes PPP payment schemes for life-cycle cost, service level, and robustness. Empirically, a dataset of 8,000–10,000 design and supervision tenders and a bridge inventory of 820 highway bridges are combined. Gradient-boosted trees and deep neural networks will predict the probability of single-bid tenders and the associated award premium and multistep bridge condition transitions at 5-year intervals, using traffic, structural type, condition indices, and intervention history as features. A reinforcement learning–based design module searches performance indicators and payment curves to generate PPP schemes that minimize net present cost and bridges reaching the worst condition state while constraining downside risk via conditional value at risk. Model-based life-cycle evaluation indicates that AI-optimized PPP contracts reduce bridges reaching emergency condition by 30%–40% over a 30-year horizon while lowering life-cycle costs by 8%–12% compared with rule-based policies, providing infrastructure agencies and private concessionaires with an integrated AI-driven life-cycle management platform.

Authors

Institutions

Publication Details

Journal
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Published
2026-08-14
DOI
https://doi.org/10.1061/jladah.ladr-1619
Primary Topic
Infrastructure Maintenance and Monitoring
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

AI-Enabled Performance-Based Procurement and Life-Cycle Maintenance of Highway Bridges: Integrating Single-Bid Risk Analytics and PPP Payment Optimization

Odey Alshboul, Ali Shehadeh
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Infrastructure Maintenance and Monitoring
article

AI-Enabled Performance-Based Procurement and Life-Cycle Maintenance of Highway Bridges: Integrating Single-Bid Risk Analytics and PPP Payment Optimization

Odey Alshboul, Ali Shehadeh
article en

Abstract

Abstract Aging bridges, tight budgets, and procurement inefficiencies require a data-driven approach to maintenance contracts. Existing evidence shows that information and communication technology (ICT)–based construction management improves site productivity but remains unevenly adopted, a significant percentage of consultant tenders were single bid with systematically higher award rates, and public–private partnership (PPP) models for bridges that use Markovian deterioration modeling and performance-based payments can incentivize preventive maintenance, but they remain sensitive to prediction errors. Building on these strands, we propose an artificial intelligence (AI)–enabled framework that predicts the risk and cost impact of single-bid procurement, forecasts bridge condition trajectories using ICT-derived inspection and monitoring data, and optimizes PPP payment schemes for life-cycle cost, service level, and robustness. Empirically, a dataset of 8,000–10,000 design and supervision tenders and a bridge inventory of 820 highway bridges are combined. Gradient-boosted trees and deep neural networks will predict the probability of single-bid tenders and the associated award premium and multistep bridge condition transitions at 5-year intervals, using traffic, structural type, condition indices, and intervention history as features. A reinforcement learning–based design module searches performance indicators and payment curves to generate PPP schemes that minimize net present cost and bridges reaching the worst condition state while constraining downside risk via conditional value at risk. Model-based life-cycle evaluation indicates that AI-optimized PPP contracts reduce bridges reaching emergency condition by 30%–40% over a 30-year horizon while lowering life-cycle costs by 8%–12% compared with rule-based policies, providing infrastructure agencies and private concessionaires with an integrated AI-driven life-cycle management platform.

Journal of Legal Affairs and Dispute Resolution in Engineering and ConstructionVol. 18(4)
Hashemite University (JO), Dhofar University (OM)
Openalex Percentile: Top 15%
Infrastructure Maintenance and Monitoring
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.