Alternative Contract Design: Analysing the Bankability of Fungible Derivative Contracts in Energy‐Only Markets

ABSTRACT With the retirement of 21GW of legacy coal fleet looming, the task to replace Australia's thermal capacity with alternative firmed renewable ‘bulk energy’ solutions is non‐trivial. Indeed, calibrating necessary capital investment in new plant stock with efficient economic outcomes, vis‐à‐vis cost and reliability, represents a fundamental challenge to the ‘dynamic efficiency’ ideal for energy‐only markets. Recently, a major review of Australia's National Electricity Market (NEM) has proposed that underwriting of new energy generation utilise fungible derivative contracts instead of the canonical run‐of‐plant (RoP) revenue contract design. The proposition is based upon re‐linking medium‐ and long‐term energy markets, while mitigating some of the worst externalities attributed to off‐market underwriting policies when implemented at‐scale. However, sound economic theory can collide with applied corporate finance in practice. The very basis of the RoP design has been to address the needs of capital markets vis‐à‐vis revenue quality for new‐entrant plant, making bankability a threshold issue for contract viability. This article examines a set of proposed fungible contract designs, leveraging 100 years of synthetic, stochastic market data to draw conclusions on the compatibility of contract fungibility and bankability. Findings indicate that eliminating incentive incompatibilities between plant dispatch and market signals (which are inherent in the RoP design) appears adequate to counteract ‘shape’ risk—both idiosyncratic and systematic—within the confines of a typical project finance structure. In other words, bankability and fungibility do not appear to be mutually exclusive.

Authors

Institutions

Publication Details

Journal
Australian Journal of Agricultural and Resource Economics
Published
2026-08-03
DOI
https://doi.org/10.1111/1467-8489.70149
Primary Topic
Electric Power System Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Alternative Contract Design: Analysing the Bankability of Fungible Derivative Contracts in Energy‐Only Markets

Nicholas Gohdes, Tim Nelson, Phillip Hirschhorn
Australian Journal of Agricultural and Resource Economics
Electric Power System Optimization
article

Alternative Contract Design: Analysing the Bankability of Fungible Derivative Contracts in Energy‐Only Markets

Nicholas Gohdes, Tim Nelson, Phillip Hirschhorn
article en

Abstract

ABSTRACT With the retirement of 21GW of legacy coal fleet looming, the task to replace Australia's thermal capacity with alternative firmed renewable ‘bulk energy’ solutions is non‐trivial. Indeed, calibrating necessary capital investment in new plant stock with efficient economic outcomes, vis‐à‐vis cost and reliability, represents a fundamental challenge to the ‘dynamic efficiency’ ideal for energy‐only markets. Recently, a major review of Australia's National Electricity Market (NEM) has proposed that underwriting of new energy generation utilise fungible derivative contracts instead of the canonical run‐of‐plant (RoP) revenue contract design. The proposition is based upon re‐linking medium‐ and long‐term energy markets, while mitigating some of the worst externalities attributed to off‐market underwriting policies when implemented at‐scale. However, sound economic theory can collide with applied corporate finance in practice. The very basis of the RoP design has been to address the needs of capital markets vis‐à‐vis revenue quality for new‐entrant plant, making bankability a threshold issue for contract viability. This article examines a set of proposed fungible contract designs, leveraging 100 years of synthetic, stochastic market data to draw conclusions on the compatibility of contract fungibility and bankability. Findings indicate that eliminating incentive incompatibilities between plant dispatch and market signals (which are inherent in the RoP design) appears adequate to counteract ‘shape’ risk—both idiosyncratic and systematic—within the confines of a typical project finance structure. In other words, bankability and fungibility do not appear to be mutually exclusive.

Australian Journal of Agricultural and Resource Economics
Griffith University (AU)
Openalex Percentile: Top 16%
Electric Power System Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.