Review of Decision-Making Tools for Accelerated Bridge Construction in the United States

Accelerated Bridge Construction (ABC) projects in the United States (U.S.) have consistently demonstrated the significant advantages of prefabrication over conventional construction methods. Since the early 2010s, the adoption of ABC has expanded steadily, with projects achieving substantial reductions in construction duration while concurrently mitigating traffic disruptions. Screening-level evaluation and decision-making tools for selecting between ABC and conventional construction methods emerged in the U.S. in the mid-2000s. These tools, together with cost-estimation tools developed to support them, have continued to evolve. This paper presents a comprehensive literature review examining the evolution of screening-level evaluation, decision-making, and cost-estimation tools for ABC projects in the U.S. The review indicates that existing qualitative and quantitative evaluation and decision-making approaches remain practically useful for the selection of ABC methods but exhibit limited methodological robustness when applied to support decisions across a broad range of influencing factors. However, hybrid approaches based on the Analytic Hierarchy Process (AHP) represent an important advancement toward more structured Multi-Criteria Decision-Making (MCDM). In particular, AHP hybrid models constitute a significant progression beyond traditional AHP by mitigating several of its inherent limitations. The review also highlights that early cost-estimation approaches incorporated within evaluation and decision-making frameworks primarily focused on short-term construction costs and road user costs associated with the construction phase. However, with sustainability becoming a principal objective of modern infrastructure management, Life-Cycle Cost (LCC) estimation should comprehensively incorporate long-term Maintenance and Rehabilitation (M&R) expenditures throughout the entire service life of bridge infrastructure. Furthermore, the review highlights the need for improved screening-level MCDM tools capable of strengthening the identification and selection of preferred ABC alternatives during the earliest stages of project development while enhancing their long-term sustainability.

Authors

Institutions

Publication Details

Journal
Sustainability
Published
2026-08-03
DOI
https://doi.org/10.3390/su18157868
Primary Topic
Infrastructure Maintenance and Monitoring
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Review of Decision-Making Tools for Accelerated Bridge Construction in the United States

Munzer Hassan, Sylvain St-Pierre
Sustainability
Infrastructure Maintenance and Monitoring
article

Review of Decision-Making Tools for Accelerated Bridge Construction in the United States

Munzer Hassan, Sylvain St-Pierre
article en

Abstract

Accelerated Bridge Construction (ABC) projects in the United States (U.S.) have consistently demonstrated the significant advantages of prefabrication over conventional construction methods. Since the early 2010s, the adoption of ABC has expanded steadily, with projects achieving substantial reductions in construction duration while concurrently mitigating traffic disruptions. Screening-level evaluation and decision-making tools for selecting between ABC and conventional construction methods emerged in the U.S. in the mid-2000s. These tools, together with cost-estimation tools developed to support them, have continued to evolve. This paper presents a comprehensive literature review examining the evolution of screening-level evaluation, decision-making, and cost-estimation tools for ABC projects in the U.S. The review indicates that existing qualitative and quantitative evaluation and decision-making approaches remain practically useful for the selection of ABC methods but exhibit limited methodological robustness when applied to support decisions across a broad range of influencing factors. However, hybrid approaches based on the Analytic Hierarchy Process (AHP) represent an important advancement toward more structured Multi-Criteria Decision-Making (MCDM). In particular, AHP hybrid models constitute a significant progression beyond traditional AHP by mitigating several of its inherent limitations. The review also highlights that early cost-estimation approaches incorporated within evaluation and decision-making frameworks primarily focused on short-term construction costs and road user costs associated with the construction phase. However, with sustainability becoming a principal objective of modern infrastructure management, Life-Cycle Cost (LCC) estimation should comprehensively incorporate long-term Maintenance and Rehabilitation (M&R) expenditures throughout the entire service life of bridge infrastructure. Furthermore, the review highlights the need for improved screening-level MCDM tools capable of strengthening the identification and selection of preferred ABC alternatives during the earliest stages of project development while enhancing their long-term sustainability.

SustainabilityVol. 18(15)
Université du Québec à Montréal (CA), École de Technologie Supérieure (CA)
Industry, innovation and infrastructure
Openalex Percentile: Top 14%
Infrastructure Maintenance and Monitoring
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.