Comparative analysis of ensemble machine learning models for predicting material delivery delays in construction procurement and logistics

Material delivery delays represent a critical challenge in construction supply management, driving schedule overruns and cost escalation. Traditional delay-prediction approaches rely on subjective judgement and struggle to capture complex patterns in procurement and logistics processes. This paper develops an ensemble machine-learning (ML) model framework to predict delay occurrence and forecast duration using a real-world material delivery records dataset. The ensemble ML models were tuned using five-fold cross-validation repeated across five random seeds on the training set of a stratified 80:20 train-test split and evaluated on the completely unseen test set, on a dataset encompassing procurement and logistics operations to improve supply chain robustness. CatBoost was the best-performing classifier overall and handled the class imbalance most reliably, achieving the highest ROC-AUC (0.958), balanced accuracy (0.903), specificity (0.883) and MCC (0.673) on the test set. However, XGBoost achieved the best prediction accuracy for the delay duration with an R2 of 0.720, RMSE of 34.6 days and MAE of 17.5 days, indicating better agreement with actual delay durations compared with other existing ML models. In addition, SHAP analysis identifies manufacturer, material characteristics, project size and source country as the most influential predictors. Finally, the framework improves early visibility of risks and provides early warnings at the purchase-order preparation stage, supporting supplier evaluation, procurement planning and proactive decision-making in the construction supply management.

Authors

Institutions

Publication Details

Journal
International Journal of Construction Management
Published
2026-08-03
DOI
https://doi.org/10.1080/15623599.2026.2708230
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Comparative analysis of ensemble machine learning models for predicting material delivery delays in construction procurement and logistics

Adel Alshibani, Wahid Billah, Saddam Hussain Khan, Awsan Mohammed et al.
International Journal of Construction Management
Construction Project Management and Performance
article

Comparative analysis of ensemble machine learning models for predicting material delivery delays in construction procurement and logistics

Adel Alshibani, Wahid Billah, Saddam Hussain Khan, Awsan Mohammed, Mustafa Alkhalifah, Ahmed M. Ghaithan
article en

Abstract

Material delivery delays represent a critical challenge in construction supply management, driving schedule overruns and cost escalation. Traditional delay-prediction approaches rely on subjective judgement and struggle to capture complex patterns in procurement and logistics processes. This paper develops an ensemble machine-learning (ML) model framework to predict delay occurrence and forecast duration using a real-world material delivery records dataset. The ensemble ML models were tuned using five-fold cross-validation repeated across five random seeds on the training set of a stratified 80:20 train-test split and evaluated on the completely unseen test set, on a dataset encompassing procurement and logistics operations to improve supply chain robustness. CatBoost was the best-performing classifier overall and handled the class imbalance most reliably, achieving the highest ROC-AUC (0.958), balanced accuracy (0.903), specificity (0.883) and MCC (0.673) on the test set. However, XGBoost achieved the best prediction accuracy for the delay duration with an R2 of 0.720, RMSE of 34.6 days and MAE of 17.5 days, indicating better agreement with actual delay durations compared with other existing ML models. In addition, SHAP analysis identifies manufacturer, material characteristics, project size and source country as the most influential predictors. Finally, the framework improves early visibility of risks and provides early warnings at the purchase-order preparation stage, supporting supplier evaluation, procurement planning and proactive decision-making in the construction supply management.

International Journal of Construction Management
King Fahd University of Petroleum and Minerals (SA)
Openalex Percentile: Top 6%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Comparative analysis of ensemble machine learning models for predicting material delivery delays in construction procurement and logistics — Adel Alshibani, Wahid Billah, et al. · International Journal of Construction Management (2026) | TGRS Research Map | TGRS