Assessment of Hot Weather Concreting Practiced in Bangladesh

Hot weather problems are normally met in the summer season. Climatic situations of high winds, low humidity, and high solar radiation can occur, especially in hot weather. At this time concreting in high temperatures needs special precaution. This study deals to assess the measure taken to handle the hot weather concreting practiced in different projects of Bangladesh. Accordingly, six large construction projects in Dhaka, Bangladesh, were surveyed and visited to study the hot weather concreting procedures. Senior officials of the construction teams were questioned during this procedure, and questionnaires were used to gather data on various hot weather concreting concerns. Additionally, the Bangladesh Building Code and other authoritative sources of literature have been checked for conformity with the hot weather concreting procedures used in various construction sites. After analyzing the results from the questionnaire survey, BNBC, and other current construction techniques found in the literature, recommendations and guidelines for correctly handling hot weather concreting are finally put forward. This study has shown that concrete in hot weather needs to be carefully prepared. A pre-concreting meeting is suggested to go over the plan for managing the concreting during hot weather. Using materials that have a track record of performing well in hot environments, cooling concrete materials or concrete mixtures, providing consistent manpower and equipment for quick placement, cutting down on transport times, scheduling placement to minimize exposure to atmospheric conditions, planning to minimize rapid moisture loss, and considering the use of evaporation retarders are other strategies that can help. Therefore, appropriate measures must be taken at each stage of the hot weather concreting process, including material storage, concrete mixing, transportation, placement, finishing, curing, and concrete cube casting for testing, to produce better and longer-lasting concrete.

Authors

Institutions

Publication Details

Journal
International Journal of Concrete Structures and Materials
Published
2026-07-30
DOI
https://doi.org/10.1186/s40069-026-00941-1
Primary Topic
Concrete Properties and Behavior
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Assessment of Hot Weather Concreting Practiced in Bangladesh

Sharmin Reza Chowdhury, Raisul Islam Shuvo, Md. Golam Kibria
International Journal of Concrete Structures and Materials
Concrete Properties and Behavior
article

Assessment of Hot Weather Concreting Practiced in Bangladesh

Sharmin Reza Chowdhury, Raisul Islam Shuvo, Md. Golam Kibria
article en

Abstract

Hot weather problems are normally met in the summer season. Climatic situations of high winds, low humidity, and high solar radiation can occur, especially in hot weather. At this time concreting in high temperatures needs special precaution. This study deals to assess the measure taken to handle the hot weather concreting practiced in different projects of Bangladesh. Accordingly, six large construction projects in Dhaka, Bangladesh, were surveyed and visited to study the hot weather concreting procedures. Senior officials of the construction teams were questioned during this procedure, and questionnaires were used to gather data on various hot weather concreting concerns. Additionally, the Bangladesh Building Code and other authoritative sources of literature have been checked for conformity with the hot weather concreting procedures used in various construction sites. After analyzing the results from the questionnaire survey, BNBC, and other current construction techniques found in the literature, recommendations and guidelines for correctly handling hot weather concreting are finally put forward. This study has shown that concrete in hot weather needs to be carefully prepared. A pre-concreting meeting is suggested to go over the plan for managing the concreting during hot weather. Using materials that have a track record of performing well in hot environments, cooling concrete materials or concrete mixtures, providing consistent manpower and equipment for quick placement, cutting down on transport times, scheduling placement to minimize exposure to atmospheric conditions, planning to minimize rapid moisture loss, and considering the use of evaporation retarders are other strategies that can help. Therefore, appropriate measures must be taken at each stage of the hot weather concreting process, including material storage, concrete mixing, transportation, placement, finishing, curing, and concrete cube casting for testing, to produce better and longer-lasting concrete.

International Journal of Concrete Structures and MaterialsVol. 20(1)
Ahsanullah University of Science and Technology (BD)
Sustainable cities and communities
Openalex Percentile: Top 14%
Concrete Properties and Behavior
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.