Prediction of Backfill Slurry Shrinkage Rate and Optimization of Roof-Contact Backfilling Based on an Optimized Neural Network Approach

In backfill mining of metal mines, the sedimentation and shrinkage of backfill slurry critically affect roof-contact quality and stope stability. This study investigates these characteristics for unsorted tailings backfill slurry from the Daye Iron Mine through laboratory experiments and develops a prediction model for the shrinkage rate. Tests examined the effects of cement-to-tailings ratio (1:4 to 1:20) and slurry concentration (65% to 71%) on shrinkage rate over curing time. A crested porcupine optimizer-backpropagation (CPO-BP) neural network model was developed to predict the shrinkage rate and compared with the traditional BP model. The robustness and generalization capability of the model were further verified by repeated five-fold cross-validation and by comparison with the GA-BP, PSO-BP, random forest, support vector regression, and XGBoost models. Results show that shrinkage predominantly occurs within the first 8 h and stabilizes after 24 h; high-concentration slurries stabilize earlier. At a fixed concentration, the shrinkage rate increases with decreasing cement-to-tailings ratio; at a fixed ratio, it decreases with increasing concentration. The CPO-BP model significantly outperforms the BP model, achieving a mean squared error (MSE) of 3.0767 × 10−6, a mean absolute error (MAE) of 1.4528 × 10−3, and a coefficient of determination (R2) of 0.94946 on the test set. For the Daye Iron Mine, a slurry concentration of 69–71% reduces shrinkage height and improves roof-contact rate. This study reveals the evolution of shrinkage rate with curing time, cement-to-tailings ratio, and concentration, demonstrates the effectiveness of the CPO-BP model, and optimizes the backfilling scheme, providing a theoretical basis for roof-contact quality control in practice.

Authors

Institutions

Publication Details

Journal
Applied Sciences
Published
2026-07-30
DOI
https://doi.org/10.3390/app16157562
Primary Topic
Tailings Management and Properties
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Prediction of Backfill Slurry Shrinkage Rate and Optimization of Roof-Contact Backfilling Based on an Optimized Neural Network Approach

Haoliang Han, Yuchao Deng, Hongjiao Li, Yuye Tan et al.
Applied Sciences
Tailings Management and Properties
article

Prediction of Backfill Slurry Shrinkage Rate and Optimization of Roof-Contact Backfilling Based on an Optimized Neural Network Approach

Haoliang Han, Yuchao Deng, Hongjiao Li, Yuye Tan, Jiazhao Chen, Xu Huang
article en

Abstract

In backfill mining of metal mines, the sedimentation and shrinkage of backfill slurry critically affect roof-contact quality and stope stability. This study investigates these characteristics for unsorted tailings backfill slurry from the Daye Iron Mine through laboratory experiments and develops a prediction model for the shrinkage rate. Tests examined the effects of cement-to-tailings ratio (1:4 to 1:20) and slurry concentration (65% to 71%) on shrinkage rate over curing time. A crested porcupine optimizer-backpropagation (CPO-BP) neural network model was developed to predict the shrinkage rate and compared with the traditional BP model. The robustness and generalization capability of the model were further verified by repeated five-fold cross-validation and by comparison with the GA-BP, PSO-BP, random forest, support vector regression, and XGBoost models. Results show that shrinkage predominantly occurs within the first 8 h and stabilizes after 24 h; high-concentration slurries stabilize earlier. At a fixed concentration, the shrinkage rate increases with decreasing cement-to-tailings ratio; at a fixed ratio, it decreases with increasing concentration. The CPO-BP model significantly outperforms the BP model, achieving a mean squared error (MSE) of 3.0767 × 10−6, a mean absolute error (MAE) of 1.4528 × 10−3, and a coefficient of determination (R2) of 0.94946 on the test set. For the Daye Iron Mine, a slurry concentration of 69–71% reduces shrinkage height and improves roof-contact rate. This study reveals the evolution of shrinkage rate with curing time, cement-to-tailings ratio, and concentration, demonstrates the effectiveness of the CPO-BP model, and optimizes the backfilling scheme, providing a theoretical basis for roof-contact quality control in practice.

Applied SciencesVol. 16(15)
Jiangxi University of Water Resources and Electric Power (CN), Beijing General Research Institute of Mining and Metallurgy (CN), University of Science and Technology Beijing (CN)
National Natural Science Foundation of China
Openalex Percentile: Top 14%
Tailings Management and Properties
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.