Mitigating contractual risks for EPC-based power projects in emerging economies: an empirical investigation in Pakistan

EPC-based power projects under Independent Power Producer (IPP) frameworks in emerging economies often face persistence performance instability due to contractual complexities and institutional constraints. This study investigates the influence of contractual risks on project performance outcomes, specifically cost overrun and schedule delay in Pakistan’s power sector. A quantitative empirical study approach was adopted, integrating stakeholder-based risk prioritization via the Relative Importance Index (RII), Exploratory Factor Analysis (EFA), and multiple regression modeling. Twenty-seven contractual risk factors were clustered into five dimensions: (F1) contractual governance and scope, (F2) financial and payment, (F3) regulatory and political, (F4) technical and operational, and (F5) environmental and social risks. Empirical results reveal that financial and payment risks (F2) predominantly drive cost escalation, while governance and scope risks (F1) primarily contribute to schedule delays. Other risk dimensions exhibited comparatively weaker direct effects but influence project outcomes indirectly through institutional and contractual mechanisms. Drawing on Risk Allocation Theory, Agency Theory, and Transaction Cost Economics, a structured contractual governance enhancement framework is proposed, encompassing financial security stabilization, incentive and monitoring realignment, and coordination cost reduction. The study offers practical guidance for EPC contractors, project sponsors, and regulators, while extending theoretical understanding of contractual risk pathways in emerging infrastructure markets.

Authors

Institutions

Publication Details

Journal
International Journal of Construction Management
Published
2026-07-30
DOI
https://doi.org/10.1080/15623599.2026.2710274
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Mitigating contractual risks for EPC-based power projects in emerging economies: an empirical investigation in Pakistan

Sajjad Mubin, Anam Fatima, Ahmad Riaz, Tehseen Ullah
International Journal of Construction Management
Construction Project Management and Performance
article

Mitigating contractual risks for EPC-based power projects in emerging economies: an empirical investigation in Pakistan

Sajjad Mubin, Anam Fatima, Ahmad Riaz, Tehseen Ullah
article en

Abstract

EPC-based power projects under Independent Power Producer (IPP) frameworks in emerging economies often face persistence performance instability due to contractual complexities and institutional constraints. This study investigates the influence of contractual risks on project performance outcomes, specifically cost overrun and schedule delay in Pakistan’s power sector. A quantitative empirical study approach was adopted, integrating stakeholder-based risk prioritization via the Relative Importance Index (RII), Exploratory Factor Analysis (EFA), and multiple regression modeling. Twenty-seven contractual risk factors were clustered into five dimensions: (F1) contractual governance and scope, (F2) financial and payment, (F3) regulatory and political, (F4) technical and operational, and (F5) environmental and social risks. Empirical results reveal that financial and payment risks (F2) predominantly drive cost escalation, while governance and scope risks (F1) primarily contribute to schedule delays. Other risk dimensions exhibited comparatively weaker direct effects but influence project outcomes indirectly through institutional and contractual mechanisms. Drawing on Risk Allocation Theory, Agency Theory, and Transaction Cost Economics, a structured contractual governance enhancement framework is proposed, encompassing financial security stabilization, incentive and monitoring realignment, and coordination cost reduction. The study offers practical guidance for EPC contractors, project sponsors, and regulators, while extending theoretical understanding of contractual risk pathways in emerging infrastructure markets.

International Journal of Construction Management
University of Engineering and Technology Lahore (PK), University of Okara (PK), Chancellor University (US)
Openalex Percentile: Top 6%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.