Hydropower and Sediment Siltation Evaluation Research

With the acceleration of China's energy structure transition and the successful completion of the “14th Five-Year Plan” targets, hydropower's position as a backbone of clean energy has been continuously strengthened. Based on the latest 2025 hydropower data and energy policies, combined with modern sediment management methods, this paper conducts an optimized evaluation of the engineering tasks, installed capacity, and operation schemes of X Hydropower Station in Southwest China. In terms of sediment siltation assessment, the SUSBED-2 one-dimensional steady non-uniform flow sediment transport model was used to compare three operation schemes. The results show that the flood season restriction water level of 1,098 m can effectively control the reservoir capacity loss rate within 44%. The study indicates that an installed capacity of 120 MW for X Hydropower Station is the optimal solution balancing economic benefits and engineering feasibility.

Authors

Institutions

Publication Details

Journal
Springer Link (Chiba Institute of Technology)
Published
2026-07-27
DOI
https://doi.org/10.1051/e3sconf/202672801010/pdf
Primary Topic
Water resources management and optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Hydropower and Sediment Siltation Evaluation Research

Jialuolun Ma
Springer Link (Chiba Institute of Technology)
Water resources management and optimization
article

Hydropower and Sediment Siltation Evaluation Research

Jialuolun Ma
article en

Abstract

With the acceleration of China's energy structure transition and the successful completion of the “14th Five-Year Plan” targets, hydropower's position as a backbone of clean energy has been continuously strengthened. Based on the latest 2025 hydropower data and energy policies, combined with modern sediment management methods, this paper conducts an optimized evaluation of the engineering tasks, installed capacity, and operation schemes of X Hydropower Station in Southwest China. In terms of sediment siltation assessment, the SUSBED-2 one-dimensional steady non-uniform flow sediment transport model was used to compare three operation schemes. The results show that the flood season restriction water level of 1,098 m can effectively control the reservoir capacity loss rate within 44%. The study indicates that an installed capacity of 120 MW for X Hydropower Station is the optimal solution balancing economic benefits and engineering feasibility.

Springer Link (Chiba Institute of Technology)
Yunnan Normal University (CN)
Industry, innovation and infrastructure
Openalex Percentile: Top 11%
Water resources management and optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Hydropower and Sediment Siltation Evaluation Research — Jialuolun Ma · Springer Link (Chiba Institute of Technology) (2026) | TGRS Research Map | TGRS