Energy-as-a-service in Bulgaria: A techno-economic model of industrial PV + BESS contracts under the Post-RED III framework

Energy-as-a-Service (EaaS) shifts capital, operational, and performance risk for distributed energy resources from the consumer to a specialized provider, in exchange for a long-term fee indexed to delivered energy or to a measured outcome. In Bulgaria, the rapid deployment of photovoltaic (PV) plants and battery energy storage systems (BESS), together with the post-2023 regulatory reset (the Energy Act storage amendments, Ordinance No. 6/2024 on grid connection, transposition of RED III and the recast Energy Efficiency Directive), has opened space for EaaS structures behind the meter of industrial consumers. This paper builds a techno-economic model of a PV + BESS-as-a-Service contract for a mid-size Bulgarian manufacturer (5 MW peak load, 22 GWh annual consumption) served by a 4 MWp PV plant and a 2 MW / 4 MWh lithium-iron-phosphate battery. An hourly dispatch of PV generation against a three-shift industrial load feeds a 15-year cash-flow model at a 130 €/MWh service tariff. Under base-case assumptions (capex 4.18 M€, 8% discount rate, 150 €/MWh grid counterfactual), the provider earns a project IRR of 9.6% with an NPV of +0.44 M€, while the off-taker saves approximately 82 k€ per year at zero capex and books the fee as operating expense under IFRS 16. The outcome is most exposed to the service tariff, the discount rate, and capex: provider NPV turns negative below a 117 €/MWh tariff or above a 9.6% discount rate, and the off-taker's saving disappears if its all-in grid price falls to 130 €/MWh. EaaS is economically feasible in Bulgaria today, but the margin is thin, and the contractual and accounting infrastructure has not yet caught up with the technology.

Authors

Institutions

Publication Details

Journal
Springer Link (Chiba Institute of Technology)
Published
2026-07-27
DOI
https://doi.org/10.1051/e3sconf/202672702003/pdf
Primary Topic
Integrated Energy Systems Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Energy-as-a-service in Bulgaria: A techno-economic model of industrial PV + BESS contracts under the Post-RED III framework

Владимир Зиновиев
Springer Link (Chiba Institute of Technology)
Integrated Energy Systems Optimization
article

Energy-as-a-service in Bulgaria: A techno-economic model of industrial PV + BESS contracts under the Post-RED III framework

Владимир Зиновиев
article en

Abstract

Energy-as-a-Service (EaaS) shifts capital, operational, and performance risk for distributed energy resources from the consumer to a specialized provider, in exchange for a long-term fee indexed to delivered energy or to a measured outcome. In Bulgaria, the rapid deployment of photovoltaic (PV) plants and battery energy storage systems (BESS), together with the post-2023 regulatory reset (the Energy Act storage amendments, Ordinance No. 6/2024 on grid connection, transposition of RED III and the recast Energy Efficiency Directive), has opened space for EaaS structures behind the meter of industrial consumers. This paper builds a techno-economic model of a PV + BESS-as-a-Service contract for a mid-size Bulgarian manufacturer (5 MW peak load, 22 GWh annual consumption) served by a 4 MWp PV plant and a 2 MW / 4 MWh lithium-iron-phosphate battery. An hourly dispatch of PV generation against a three-shift industrial load feeds a 15-year cash-flow model at a 130 €/MWh service tariff. Under base-case assumptions (capex 4.18 M€, 8% discount rate, 150 €/MWh grid counterfactual), the provider earns a project IRR of 9.6% with an NPV of +0.44 M€, while the off-taker saves approximately 82 k€ per year at zero capex and books the fee as operating expense under IFRS 16. The outcome is most exposed to the service tariff, the discount rate, and capex: provider NPV turns negative below a 117 €/MWh tariff or above a 9.6% discount rate, and the off-taker's saving disappears if its all-in grid price falls to 130 €/MWh. EaaS is economically feasible in Bulgaria today, but the margin is thin, and the contractual and accounting infrastructure has not yet caught up with the technology.

Springer Link (Chiba Institute of Technology)
University of National and World Economy (BG)
Affordable and clean energy
Openalex Percentile: Top 15%
Integrated Energy Systems Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.