Forecasting Steel Reinforcement Bar Prices in Egypt Using ARDL: A Macroeconomic Leading Indicator Framework for Building Cost Management

Budget overruns driven by unpredictable building material prices are a persistent challenge in emerging economies, yet reliable price forecasting tools for structural materials such as steel reinforcement bar (RFT) remain largely unavailable to building project teams. This study develops an Autoregressive Distributed-Lag (ARDL) model to forecast RFT prices in Egypt using macroeconomic leading indicators. A structured filtering pipeline —stationarity testing, Variance Inflation Factor (VIF) screening, and Granger causality testing—reduced 22 candidate variables to nine predictors: producer price index (PPI), loan rate (LR), discount rate (DR), Egyptian Stock Exchange Index (EGX30), money supply (M0), exchange rate (ER), iron ore prices (ORE), American stock index (S&P500), and Hang Seng Index (HSI). ARDL bounds testing confirmed cointegration across look-back periods (LBP) of 3, 6, and 9 months. Comprehensive diagnostics confirmed model stability, homoscedasticity, and the absence of serial correlation. The ARDL was benchmarked against an Ordinary Least Squares (OLS) baseline and a first-difference vector autoregression (VAR) model. Evaluated as genuine multi-step (dynamic) forecasts over the held-out crisis-period window, the 3-month model achieved an out-of-sample mean absolute error of approximately 5.9% in price terms, retaining a clear advantage over the OLS baseline at that horizon. The proposed framework provides quantity surveyors, cost consultants, and project managers with a practical tool for setting RFT budgets at the tendering stage and optimising procurement timing. It is transferable to other building materials (cement, structural steel sections, glazing) across emerging-market construction economies.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2026-07-27
DOI
https://doi.org/10.3390/buildings16152992
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Forecasting Steel Reinforcement Bar Prices in Egypt Using ARDL: A Macroeconomic Leading Indicator Framework for Building Cost Management

Kareem Adel, Ahmed Ehab, Emad Elbeltagi, Ahmed Gomaa
Buildings
Construction Project Management and Performance
article

Forecasting Steel Reinforcement Bar Prices in Egypt Using ARDL: A Macroeconomic Leading Indicator Framework for Building Cost Management

Kareem Adel, Ahmed Ehab, Emad Elbeltagi, Ahmed Gomaa
article en

Abstract

Budget overruns driven by unpredictable building material prices are a persistent challenge in emerging economies, yet reliable price forecasting tools for structural materials such as steel reinforcement bar (RFT) remain largely unavailable to building project teams. This study develops an Autoregressive Distributed-Lag (ARDL) model to forecast RFT prices in Egypt using macroeconomic leading indicators. A structured filtering pipeline —stationarity testing, Variance Inflation Factor (VIF) screening, and Granger causality testing—reduced 22 candidate variables to nine predictors: producer price index (PPI), loan rate (LR), discount rate (DR), Egyptian Stock Exchange Index (EGX30), money supply (M0), exchange rate (ER), iron ore prices (ORE), American stock index (S&P500), and Hang Seng Index (HSI). ARDL bounds testing confirmed cointegration across look-back periods (LBP) of 3, 6, and 9 months. Comprehensive diagnostics confirmed model stability, homoscedasticity, and the absence of serial correlation. The ARDL was benchmarked against an Ordinary Least Squares (OLS) baseline and a first-difference vector autoregression (VAR) model. Evaluated as genuine multi-step (dynamic) forecasts over the held-out crisis-period window, the 3-month model achieved an out-of-sample mean absolute error of approximately 5.9% in price terms, retaining a clear advantage over the OLS baseline at that horizon. The proposed framework provides quantity surveyors, cost consultants, and project managers with a practical tool for setting RFT budgets at the tendering stage and optimising procurement timing. It is transferable to other building materials (cement, structural steel sections, glazing) across emerging-market construction economies.

BuildingsVol. 16(15)
Qassim University (SA), Arab Academy for Science, Technology, and Maritime Transport (EG), Buraydah Colleges (SA), Badr University in Cairo (EG)
Openalex Percentile: Top 5%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.