Simulation Study on Schedule Control for Engineering Design Based on System Dynamics
Abstract Engineering design phase delays persistently challenge construction projects, cascading into costly construction setbacks. Traditional static methods fail to capture dynamic feedback among schedule pressure, productivity, and design errors. A gap exists in applying system dynamics (SD) specifically to design-phase schedule control. This study develops an SD model to simulate schedule strategies, testing its efficacy as a virtual decision-making platform for proactive management. A comprehensive SD model integrating five subsystems (design process, target duration, human resources, performance, cost) was built using Vensim, validated through mental model verification and sensitivity analysis. It was applied to a petrochemical design case to simulate strategies such as overtime, recruitment, and schedule adjustments under various scenarios. Simulations revealed critical trade-offs: moderate overtime (1.25 factor) reduced the prolonged duration from 72 days to near the original plan but increased costs; midphase recruitment of L2 employees optimally balanced progress and budget; combined L3/L2 recruitment best mitigated senior staff turnover impacts. This research contributes to the body of knowledge by providing (1) a novel validated SD model tailored to design-phase dynamics, addressing a literature gap, and (2) a practical “virtual laboratory” enabling managers to proactively test strategies, bridging theoretical planning and real-world execution in construction management.
Authors
- Xiaofu Zhang (ORCID: https://orcid.org/0000-0002-7486-2362)
Institutions
- Anyang Normal University (CN)
Publication Details
- Journal
- Journal of Construction Engineering and Management
- Published
- 2026-07-24
- DOI
- https://doi.org/10.1061/jcemd4.coeng-17718
- Primary Topic
- Construction Project Management and Performance
- Type
- article
- Field-Weighted Citation Impact
- 0.00