Automation for High-Availability Bunch Arrival Time Monitors

Electro-optical bunch arrival time measurement is a method to monitor the timing of bunches in predominantly linear electron accelerators to below femtosecond precision. Despite the method being well established, a stable and fully available measurement was reported only recently. DESY’s free-electron lasers FLASH and EuXFEL feature Bunch Arrival Time (BAM) diagnostics that serve as a standard operation data source for the facility’s longitudinal fast and slow stabilization, as well as an instrument available to the users for pump laser alignment and offline analysis. A comprehensive upgrade and R&D effort targeting the performance of DESY’s BAM was carried out in recent years. The complexity of the device poses challenges to its control layer, calibration, drift control, and operation setup. Solving these proved to be essential in reaching operational stability and high availability. We report on the updates to the BAM controls and the development of automation of numerous tasks that contributed a great deal to achieving long-term stability and full run availability.

Authors

Institutions

Publication Details

Journal
Instruments
Published
2026-07-24
DOI
https://doi.org/10.3390/instruments10030039
Primary Topic
Particle Accelerators and Free-Electron Lasers
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Automation for High-Availability Bunch Arrival Time Monitors

R. Kammering, Jens Georg, J. Kral
Instruments
Particle Accelerators and Free-Electron Lasers
article

Automation for High-Availability Bunch Arrival Time Monitors

R. Kammering, Jens Georg, J. Kral
article en

Abstract

Electro-optical bunch arrival time measurement is a method to monitor the timing of bunches in predominantly linear electron accelerators to below femtosecond precision. Despite the method being well established, a stable and fully available measurement was reported only recently. DESY’s free-electron lasers FLASH and EuXFEL feature Bunch Arrival Time (BAM) diagnostics that serve as a standard operation data source for the facility’s longitudinal fast and slow stabilization, as well as an instrument available to the users for pump laser alignment and offline analysis. A comprehensive upgrade and R&D effort targeting the performance of DESY’s BAM was carried out in recent years. The complexity of the device poses challenges to its control layer, calibration, drift control, and operation setup. Solving these proved to be essential in reaching operational stability and high availability. We report on the updates to the BAM controls and the development of automation of numerous tasks that contributed a great deal to achieving long-term stability and full run availability.

InstrumentsVol. 10(3)
Deutsches Elektronen-Synchrotron DESY (DE)
Industry, innovation and infrastructure
Openalex Percentile: Top 15%
Particle Accelerators and Free-Electron Lasers
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Automation for High-Availability Bunch Arrival Time Monitors — R. Kammering, Jens Georg, et al. · Instruments (2026) | TGRS Research Map | TGRS