Where risks concentrate in modular integrated construction: a model for risk measurement and prioritization during assembly and final installation phases

Although modular integrated construction (MiC) has gained increasing attention for its potential to improve project performance, risk assessment during the assembly and final installation phases remains underdeveloped, particularly in terms of measurement and prioritization. This study develops a risk measurement model for MiC projects during the assembly and installation phases by establishing a hierarchical structure of risk components and their associated factors and determining their relative importance under uncertainty. A total of 35 risk factors were identified through literature review and expert refinement, followed by factor analysis and fuzzy AHP weighting. The analysis identified seven risk components, with lifting operations and equipment management, component quality and interface integrity, and planning and execution alignment emerging as the dominant risk areas. At the factor level, tower crane breakdown, connection errors, and production schedules not reflecting site conditions remain the most influential risks. The model was further applied to real MiC projects, and its stability was examined through sensitivity analysis. Unlike previous studies that focused on individual aspects of MiC risk assessment, this research provides a structured model that links risk components, relative weights, and project-level risk scores to support risk measurement, prioritization, and comparison during the MiC assembly and final installation phases.

Authors

Institutions

Publication Details

Journal
International Journal of Construction Management
Published
2026-07-24
DOI
https://doi.org/10.1080/15623599.2026.2706171
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Where risks concentrate in modular integrated construction: a model for risk measurement and prioritization during assembly and final installation phases

Sy Tien Do, Viet Thanh Nguyen
International Journal of Construction Management
BIM and Construction Integration
article

Where risks concentrate in modular integrated construction: a model for risk measurement and prioritization during assembly and final installation phases

Sy Tien Do, Viet Thanh Nguyen
article en

Abstract

Although modular integrated construction (MiC) has gained increasing attention for its potential to improve project performance, risk assessment during the assembly and final installation phases remains underdeveloped, particularly in terms of measurement and prioritization. This study develops a risk measurement model for MiC projects during the assembly and installation phases by establishing a hierarchical structure of risk components and their associated factors and determining their relative importance under uncertainty. A total of 35 risk factors were identified through literature review and expert refinement, followed by factor analysis and fuzzy AHP weighting. The analysis identified seven risk components, with lifting operations and equipment management, component quality and interface integrity, and planning and execution alignment emerging as the dominant risk areas. At the factor level, tower crane breakdown, connection errors, and production schedules not reflecting site conditions remain the most influential risks. The model was further applied to real MiC projects, and its stability was examined through sensitivity analysis. Unlike previous studies that focused on individual aspects of MiC risk assessment, this research provides a structured model that links risk components, relative weights, and project-level risk scores to support risk measurement, prioritization, and comparison during the MiC assembly and final installation phases.

International Journal of Construction Management
Vietnam National University Ho Chi Minh City (VN), Industrial University of Ho Chi Minh City (VN), Ho Chi Minh City University of Technology and Engineering (VN), Ho Chi Minh City University of Technology (VN)
Industry, innovation and infrastructure
Openalex Percentile: Top 12%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Where risks concentrate in modular integrated construction: a model for risk measurement and prioritization during assembly and final installation phases — Sy Tien Do, Viet Thanh Nguyen · International Journal of Construction Management (2026) | TGRS Research Map | TGRS