EFFECT OF EFFECTIVE PREPARATION OF COST ESTIMATE ON BUILDING PROJECT DLIVERY IN ENUGU METROPOLIS

This study focused on the effect of effective preparation of cost estimate on building project delivery in Enugu metropolis. The study is guided by the following objectives, to identify the causes of cost overruns in construction projects in Enugu State, to examine the effect of cost overruns in construction projects delivery in Enugu State. The study adopted survey research design. A sample size of 190 was gotten from the population of 363. The findings of the study reveals that the causes of cost overrun in construction projects in Enugu State are underestimation of quantities or cost in bill of quantities, Incomplete or sketchy design at the tender stage, Design changes/variation orders, Inflation and material price fluctuation, Poor project planning and organization, Contract management weakness, Poor oversight of contract implementation, Contractors cash flow problems, Lack of skilled labour/poor workmanship, External/macroeconomic factor, Regulatory, permitting and political issues, Delay in obtaining approvals. The study recommends that the Enugu State Ministry of Works and professional bodies such as NIQS should establish an updated cost database that provides current market rates for materials, labour, and equipment to support accurate estimating and budgeting

Authors

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-07-23
DOI
https://doi.org/10.5281/zenodo.21510037
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

EFFECT OF EFFECTIVE PREPARATION OF COST ESTIMATE ON BUILDING PROJECT DLIVERY IN ENUGU METROPOLIS

Harrison Onyekachi Ugwu, Eucharia Chika Enebe
Zenodo (CERN European Organization for Nuclear Research)
Construction Project Management and Performance
article

EFFECT OF EFFECTIVE PREPARATION OF COST ESTIMATE ON BUILDING PROJECT DLIVERY IN ENUGU METROPOLIS

Harrison Onyekachi Ugwu, Eucharia Chika Enebe
article en

Abstract

This study focused on the effect of effective preparation of cost estimate on building project delivery in Enugu metropolis. The study is guided by the following objectives, to identify the causes of cost overruns in construction projects in Enugu State, to examine the effect of cost overruns in construction projects delivery in Enugu State. The study adopted survey research design. A sample size of 190 was gotten from the population of 363. The findings of the study reveals that the causes of cost overrun in construction projects in Enugu State are underestimation of quantities or cost in bill of quantities, Incomplete or sketchy design at the tender stage, Design changes/variation orders, Inflation and material price fluctuation, Poor project planning and organization, Contract management weakness, Poor oversight of contract implementation, Contractors cash flow problems, Lack of skilled labour/poor workmanship, External/macroeconomic factor, Regulatory, permitting and political issues, Delay in obtaining approvals. The study recommends that the Enugu State Ministry of Works and professional bodies such as NIQS should establish an updated cost database that provides current market rates for materials, labour, and equipment to support accurate estimating and budgeting

Zenodo (CERN European Organization for Nuclear Research)
Enugu State University of Science and Technology (NG)
No poverty
Openalex Percentile: Top 5%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

EFFECT OF EFFECTIVE PREPARATION OF COST ESTIMATE ON BUILDING PROJECT DLIVERY IN ENUGU METROPOLIS — Harrison Onyekachi Ugwu, Eucharia Chika Enebe · Zenodo (CERN European Organization for Nuclear Research) (2026) | TGRS Research Map | TGRS