ASSESSMENT OF DELAYS FACTORS IN BUILDING CONSTRUCTION PROJECTS IN ENUGU EAST, ENUGU STATE.

The study focused on assessing the impact of delay in building construction project in Enugu East, Enugu State. The broad objective of the study is to assess the impact of delays in building construction projects in Enugu East, Enugu State with a view of providing ways to minimize delays in building construction projects in Enugu East, Enugu State, Nigeria. The specific objectives are; to identify the client, contractors and consultant related factors causing delay in building construction project in Enugu state; to determine the management of the factors causing delay in building construction project in Enugu state; to examine the effect of factors causing delay in building construction project in Enugu state. The survey research design was used for the study. The researcher narrowed the sample observation to consultants, contractors and clients in Enugu East for feasibility reasons, the target population of this study shall be 200 registered contractors in Enugu East, 75 consultants and 400 clients, which summed up to 675 respondents. Sample size of 210 was gotten through Taro Yamane formula. The findings of the study reveals that the contributing management factors in building construction. The result shows that employment of competent contractors with a mean index of 4.14, Effective planning from both the clients, consultants and contractors with a mean index of 4.09, Mistakes and discrepancies in design should be avoided with a mean index of 4.05, Insufficient finance should be eliminated on with a mean index of 3.93, the researcher believed that the identified items are the contributing management factors in building construction. Furthermore, the result of the third objective indicates that Creating doubt in the minds of the clients which has a mean index of 4.30, Abandonments of project with a mean index of 4.21, Collapse of building with a mean index of 4.17, Delay leads to mistakes in the original plan. with a mean index of 4.13, Increased production cost with a mean index of 4.09, Dispute and litigation with a mean index of 4.04, Reputational Damage with a mean index of 4.00, Quality compromise with a mean index of 3.96 and Extended disruption with a mean index of 3.92. the grand mean total which is 4.06 indicates that the identified items are the effect of delay in building construction project in Enugu State. The study recommends that delay in building construction should be properly handled by the professionals in the field to avoid cost overrun.

Authors

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-07-23
DOI
https://doi.org/10.5281/zenodo.21510291
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ASSESSMENT OF DELAYS FACTORS IN BUILDING CONSTRUCTION PROJECTS IN ENUGU EAST, ENUGU STATE.

Eucharia Chika Enebe
Zenodo (CERN European Organization for Nuclear Research)
Construction Project Management and Performance
article

ASSESSMENT OF DELAYS FACTORS IN BUILDING CONSTRUCTION PROJECTS IN ENUGU EAST, ENUGU STATE.

Eucharia Chika Enebe
article en

Abstract

The study focused on assessing the impact of delay in building construction project in Enugu East, Enugu State. The broad objective of the study is to assess the impact of delays in building construction projects in Enugu East, Enugu State with a view of providing ways to minimize delays in building construction projects in Enugu East, Enugu State, Nigeria. The specific objectives are; to identify the client, contractors and consultant related factors causing delay in building construction project in Enugu state; to determine the management of the factors causing delay in building construction project in Enugu state; to examine the effect of factors causing delay in building construction project in Enugu state. The survey research design was used for the study. The researcher narrowed the sample observation to consultants, contractors and clients in Enugu East for feasibility reasons, the target population of this study shall be 200 registered contractors in Enugu East, 75 consultants and 400 clients, which summed up to 675 respondents. Sample size of 210 was gotten through Taro Yamane formula. The findings of the study reveals that the contributing management factors in building construction. The result shows that employment of competent contractors with a mean index of 4.14, Effective planning from both the clients, consultants and contractors with a mean index of 4.09, Mistakes and discrepancies in design should be avoided with a mean index of 4.05, Insufficient finance should be eliminated on with a mean index of 3.93, the researcher believed that the identified items are the contributing management factors in building construction. Furthermore, the result of the third objective indicates that Creating doubt in the minds of the clients which has a mean index of 4.30, Abandonments of project with a mean index of 4.21, Collapse of building with a mean index of 4.17, Delay leads to mistakes in the original plan. with a mean index of 4.13, Increased production cost with a mean index of 4.09, Dispute and litigation with a mean index of 4.04, Reputational Damage with a mean index of 4.00, Quality compromise with a mean index of 3.96 and Extended disruption with a mean index of 3.92. the grand mean total which is 4.06 indicates that the identified items are the effect of delay in building construction project in Enugu State. The study recommends that delay in building construction should be properly handled by the professionals in the field to avoid cost overrun.

Zenodo (CERN European Organization for Nuclear Research)
Enugu State University of Science and Technology (NG)
Sustainable cities and communities
Openalex Percentile: Top 5%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.