An efficient Draco lizard optimized stacked Bi-LSTM framework for risk mitigation and resource allocation in project management systems

Modern project management demands the mitigation of risk factors in conjunction with optimal resource utilization. Traditional approaches to risk mitigation, based on subjective assessment and supportive static tools, cannot operate effectively in a project environment filled with dynamics. Advanced analytics, artificial intelligence, and deep learning drive data-based decision-making and are able to bring forth predictive insights leading to adaptive management strategies. This paper proposed advanced deep learning approaches to improve risk reduction and optimization of resource allocation in software project management systems. First, the raw historical dataset, collected from the sources that are freely available, is gathered and preprocessed. The dataset collected contains a lot of irrelevance, which causes prediction error and computation complexity. In this regard, the pre-processing, such as one-hot encoding and normalization of data, is done, which reduces issues of data redundancy. After pre-processing, a stacked bidirectional long short-term network S-BiLSTM is proposed for the joint prediction of risks and enhancement of decision power for resource scheduling. Further, optimal resource allocation is carried out by the employment of the Draco lizard optimization DLO technique based on different parameters comprising project complexity, integration complexity, schedule pressure, team size, team experience, technology risk, and risk management maturity. The proposed framework is analyzed through a simulation on the Python platform. Various factors, such as accuracy, workload distribution analysis, resource optimization efficiency , convergence analysis, training time, and resource utilization rate, are analyzed and compared with conventional approaches to demonstrate the proposed approach’s efficiency. The proposed approach achieves a predictive accuracy of 99.2%, significantly improving the performance of the PMS in project risk identification.

Authors

Institutions

Publication Details

Journal
Scientific Reports
Published
2026-07-22
DOI
https://doi.org/10.1038/s41598-026-58547-2
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An efficient Draco lizard optimized stacked Bi-LSTM framework for risk mitigation and resource allocation in project management systems

Nagaraju Devarakonda, Hussain Syed, Mohammed Ali Shaik
Scientific Reports
Construction Project Management and Performance
article

An efficient Draco lizard optimized stacked Bi-LSTM framework for risk mitigation and resource allocation in project management systems

Nagaraju Devarakonda, Hussain Syed, Mohammed Ali Shaik
article en

Abstract

Modern project management demands the mitigation of risk factors in conjunction with optimal resource utilization. Traditional approaches to risk mitigation, based on subjective assessment and supportive static tools, cannot operate effectively in a project environment filled with dynamics. Advanced analytics, artificial intelligence, and deep learning drive data-based decision-making and are able to bring forth predictive insights leading to adaptive management strategies. This paper proposed advanced deep learning approaches to improve risk reduction and optimization of resource allocation in software project management systems. First, the raw historical dataset, collected from the sources that are freely available, is gathered and preprocessed. The dataset collected contains a lot of irrelevance, which causes prediction error and computation complexity. In this regard, the pre-processing, such as one-hot encoding and normalization of data, is done, which reduces issues of data redundancy. After pre-processing, a stacked bidirectional long short-term network S-BiLSTM is proposed for the joint prediction of risks and enhancement of decision power for resource scheduling. Further, optimal resource allocation is carried out by the employment of the Draco lizard optimization DLO technique based on different parameters comprising project complexity, integration complexity, schedule pressure, team size, team experience, technology risk, and risk management maturity. The proposed framework is analyzed through a simulation on the Python platform. Various factors, such as accuracy, workload distribution analysis, resource optimization efficiency , convergence analysis, training time, and resource utilization rate, are analyzed and compared with conventional approaches to demonstrate the proposed approach’s efficiency. The proposed approach achieves a predictive accuracy of 99.2%, significantly improving the performance of the PMS in project risk identification.

Scientific ReportsVol. 16(1)
SRM University (IN), VIT-AP University
Openalex Percentile: Top 4%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.