Pile load tests using Osterberg cell for New Bridgewater Bridge deep foundation

The New Bridgewater Bridge project is the largest transport infrastructure project in Tasmania’s history, which involves the construction of a new bridge over the River Derwent, and other associated road infrastructures. As part of the project requirements, a minimum of three sacrificial test piles with a minimum diameter of 1500 mm (concrete outer diameter) at representative locations were designed and constructed to verify the new River Derwent Bridge pile foundation design using Osterberg cell (O-Cell) test method. This paper discusses the basis of design, geotechnical issues, and challenges encountered in design and construction of test piles; then reviews testing performance and presents the interpretation of test data; and some interesting engineering recommendations and conclusions that have been used to expedite the approval for the installation of production piles. With this paper, the authors wish to provide some meaningful technical insights for future design and construction of similar deep foundations.

Authors

Institutions

Publication Details

Journal
Geotechnical Research
Published
2026-07-22
DOI
https://doi.org/10.1680/jgere.25.00041
Primary Topic
Geotechnical Engineering and Soil Mechanics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Pile load tests using Osterberg cell for New Bridgewater Bridge deep foundation

William Eom, Daiquan Yang, Alex Ting, Glynn Thomas
Geotechnical Research
Geotechnical Engineering and Soil Mechanics
article

Pile load tests using Osterberg cell for New Bridgewater Bridge deep foundation

William Eom, Daiquan Yang, Alex Ting, Glynn Thomas
article en

Abstract

The New Bridgewater Bridge project is the largest transport infrastructure project in Tasmania’s history, which involves the construction of a new bridge over the River Derwent, and other associated road infrastructures. As part of the project requirements, a minimum of three sacrificial test piles with a minimum diameter of 1500 mm (concrete outer diameter) at representative locations were designed and constructed to verify the new River Derwent Bridge pile foundation design using Osterberg cell (O-Cell) test method. This paper discusses the basis of design, geotechnical issues, and challenges encountered in design and construction of test piles; then reviews testing performance and presents the interpretation of test data; and some interesting engineering recommendations and conclusions that have been used to expedite the approval for the installation of production piles. With this paper, the authors wish to provide some meaningful technical insights for future design and construction of similar deep foundations.

Geotechnical ResearchVol. 13(1)
Constructing Excellence (GB), Southbank Centre (GB)
Industry, innovation and infrastructure
Openalex Percentile: Top 13%
Geotechnical Engineering and Soil Mechanics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Pile load tests using Osterberg cell for New Bridgewater Bridge deep foundation — William Eom, Daiquan Yang, et al. · Geotechnical Research (2026) | TGRS Research Map | TGRS