Passability modeling and field verification of sand screen completion strings

Running sand screen completion strings to target depth is challenging in horizontal and extended-reach wells because drag, string stiffness, borehole curvature, cuttings accumulation, and borehole shrinkage can jointly reduce passability and cause sticking. This study develops an integrated passability prediction and diagnostic workflow that combines a torque-and-drag model considering cuttings-bed-enhanced friction and buckling-induced contact force, a deformation-energy-based stiffness-matching model, and an elastic geometric-compatibility model for large-diameter downhole attachments. The workflow was applied to Well H in the Kenli 10-2 Oilfield, where the sand screen completion string became obstructed at a measured depth of 3316 m and could not pass the interval even under a maximum set-down load of 35 t. Initial analyses indicated that the string should theoretically reach the target depth, with a predicted hook-load margin of 62.67 t, a stiffness ratio greater than 1.0, and a minimum sliding-sleeve passable curvature of 8.18°/30 m. However, the apparent open-hole friction coefficient inverted from field hook-load data reached approximately 3.5, whereas the cuttings-bed-corrected friction coefficient increased only from 0.50 to 0.59, indicating that ordinary friction and cuttings accumulation were not the dominant causes. Further shrinkage analysis showed that a 2.2% shrinkage ratio reduced the effective borehole diameter below the sleeve outer diameter. Therefore, local borehole diameter reduction in the mudstone interval was identified as the primary sticking mechanism. After hole-enlargement reaming, the original sand screen completion string was successfully deployed, verifying the proposed workflow. The proposed workflow provides a practical approach for predicting passability, diagnosing sticking mechanisms, and designing remedial measures for sand screen deployment in complex wells.

Authors

Institutions

Publication Details

Journal
Journal of Petroleum Exploration and Production Technology
Published
2026-07-22
DOI
https://doi.org/10.1007/s13202-026-02176-y
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Passability modeling and field verification of sand screen completion strings

Z C Li, Y C, Q Chen, Hui Zhang et al.
Journal of Petroleum Exploration and Production Technology
Drilling and Well Engineering
article

Passability modeling and field verification of sand screen completion strings

Z C Li, Y C, Q Chen, Hui Zhang, Yi Zhou, Yuhang Zhao, Zhi Yang, Junbo Liu
article en

Abstract

Running sand screen completion strings to target depth is challenging in horizontal and extended-reach wells because drag, string stiffness, borehole curvature, cuttings accumulation, and borehole shrinkage can jointly reduce passability and cause sticking. This study develops an integrated passability prediction and diagnostic workflow that combines a torque-and-drag model considering cuttings-bed-enhanced friction and buckling-induced contact force, a deformation-energy-based stiffness-matching model, and an elastic geometric-compatibility model for large-diameter downhole attachments. The workflow was applied to Well H in the Kenli 10-2 Oilfield, where the sand screen completion string became obstructed at a measured depth of 3316 m and could not pass the interval even under a maximum set-down load of 35 t. Initial analyses indicated that the string should theoretically reach the target depth, with a predicted hook-load margin of 62.67 t, a stiffness ratio greater than 1.0, and a minimum sliding-sleeve passable curvature of 8.18°/30 m. However, the apparent open-hole friction coefficient inverted from field hook-load data reached approximately 3.5, whereas the cuttings-bed-corrected friction coefficient increased only from 0.50 to 0.59, indicating that ordinary friction and cuttings accumulation were not the dominant causes. Further shrinkage analysis showed that a 2.2% shrinkage ratio reduced the effective borehole diameter below the sleeve outer diameter. Therefore, local borehole diameter reduction in the mudstone interval was identified as the primary sticking mechanism. After hole-enlargement reaming, the original sand screen completion string was successfully deployed, verifying the proposed workflow. The proposed workflow provides a practical approach for predicting passability, diagnosing sticking mechanisms, and designing remedial measures for sand screen deployment in complex wells.

Journal of Petroleum Exploration and Production Technology
China University of Petroleum, Beijing (CN), Southern Company (United States) (US), Research Institute of Petroleum Exploration and Development (CN)
Openalex Percentile: Top 11%
Drilling and Well Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.