Robotic conveyor line for precast-concrete building production: units, layout optimisation, and parallel scheduling
Abstract Precast plants face labor shortages, tight delivery windows, and increasingly complex internal logistics, yet decision-level methods that couple robot-level processing times with factory layout–routing–scheduling remain limited. This paper proposes an integrated workflow for designing or retrofitting an Optimized Robotic Conveyor for Precast Concrete (ORC-PC) line and demonstrates it on a six-story reference building. Elements are grouped into product families and mapped to robotic operational units ( $$U_0$$ <mml:math xmlns:mml="http://www.w3.org/1998/Math/MathML"> <mml:msub> <mml:mi>U</mml:mi> <mml:mn>0</mml:mn> </mml:msub> </mml:math> – $$U_{12}$$ <mml:math xmlns:mml="http://www.w3.org/1998/Math/MathML"> <mml:msub> <mml:mi>U</mml:mi> <mml:mn>12</mml:mn> </mml:msub> </mml:math> ), each representing a defined workcell or resource in the ORC-PC line, in a Rhino3D factory model consistent with KUKA workspaces, safety envelopes, and formwork geometry. Family-dependent cycle times from KUKA.sim drive a Particle swarm optimisation layout model that minimizes flow-weighted conveyor length under non-overlap and clearance constraints, yielding a compact layout of approximately $$43\times 29$$ <mml:math xmlns:mml="http://www.w3.org/1998/Math/MathML"> <mml:mrow> <mml:mn>43</mml:mn> <mml:mo>×</mml:mo> <mml:mn>29</mml:mn> </mml:mrow> </mml:math> m with a loop length of about 96.6 m and implied internal transport times on the order of 10–15 min per element. A Resource-Constrained Project Scheduling Problem then embeds transport and processing times to identify bottlenecks and quantify parallelisation strategies. Results show that curing time and curing-capacity limits dominate throughput, with cage fabrication and downstream drilling acting as secondary bottlenecks under nominal parameters. Overall, under the assumed curing-capacity and scheduling parameters, the ORC-PC line approaches a production rate on the order of one story per day for the structural frame of the reference building (footprint $$\approx 320~\text {m}^2$$ <mml:math xmlns:mml="http://www.w3.org/1998/Math/MathML"> <mml:mrow> <mml:mo>≈</mml:mo> <mml:mn>320</mml:mn> <mml:mspace/> <mml:msup> <mml:mtext>m</mml:mtext> <mml:mn>2</mml:mn> </mml:msup> </mml:mrow> </mml:math> ), providing a transferable, data-driven workflow to link robot cycle times to layout decisions and capacity-planning recommendations.
Authors
- Abtin Baghdadi (ORCID: https://orcid.org/0000-0003-1259-6174)
- Harald Kloft (ORCID: https://orcid.org/0000-0003-4891-869X)
Institutions
- Technische Universität Braunschweig (DE)
Publication Details
- Journal
- Construction Robotics
- Published
- 2026-07-17
- DOI
- https://doi.org/10.1007/s41693-026-00187-z
- Primary Topic
- Innovations in Concrete and Construction Materials
- Type
- article
- Field-Weighted Citation Impact
- 0.00
Funders
- Deutsche Forschungsgemeinschaft