Economic Risk Modeling in Forestry Projects Using Harvesting and Transportation Cost Variables

This study evaluated the economic viability and risk of a eucalyptus forestry project by integrating deterministic and probabilistic economic analyses. Operational costs for motor–manual harvesting, manual extraction and loading, and forest transportation were estimated using standard cost models, while silvicultural, road maintenance, and transportation costs were obtained from operational records. Economic viability was assessed using Net Present Value (NPV), Internal Rate of Return (IRR), Equivalent Annual Value (EAV), and Average Production Cost (APC). Economic risk was evaluated through Monte Carlo simulation (10,000 iterations), considering ±10% variation in interest rate, transportation distance, harvesting productivity, labor, fuel, lubricant, and road maintenance costs, followed by sensitivity and correlation analyses. The project was economically viable, presenting an NPV of USD 110.11 ha−1, an IRR of 8.0%, an EAV of USD 20.43 ha−1 year−1, and an APC of USD 29.11 m−3. Transportation distance showed a limited operational slack of only 10 km when land cost was considered, indicating that the project operates close to its economic limit. Monte Carlo simulation indicated an 11.5% probability of economic infeasibility, while interest rate, transportation distance, and manual loading cost exerted the greatest negative influence on NPV. The integrated deterministic and probabilistic approach enabled the identification of critical operational thresholds for transportation distance, timber price, wood productivity, and land cost under the evaluated conditions, providing practical decision-support parameters for transportation planning, cost management, and economic risk assessment in similar forestry projects.

Authors

Institutions

Publication Details

Journal
Forests
Published
2026-07-17
DOI
https://doi.org/10.3390/f17070846
Primary Topic
Forest Biomass Utilization and Management
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Economic Risk Modeling in Forestry Projects Using Harvesting and Transportation Cost Variables

Cássio Furtado Lima, Leonardo França da Silva, Nilton César Fiedler, Roldão Carlos Andrade Lima et al.
Forests
Forest Biomass Utilization and Management
article

Economic Risk Modeling in Forestry Projects Using Harvesting and Transportation Cost Variables

Cássio Furtado Lima, Leonardo França da Silva, Nilton César Fiedler, Roldão Carlos Andrade Lima, Márcio Lopes da Silva, Stanley Schettino, Francisco de Assis Costa Ferreira, Luís Carlos de Freitas, Victor Crespo de Oliveira, Luciano José Minette, Lucas Moraes Rufini de Souza
article en

Abstract

This study evaluated the economic viability and risk of a eucalyptus forestry project by integrating deterministic and probabilistic economic analyses. Operational costs for motor–manual harvesting, manual extraction and loading, and forest transportation were estimated using standard cost models, while silvicultural, road maintenance, and transportation costs were obtained from operational records. Economic viability was assessed using Net Present Value (NPV), Internal Rate of Return (IRR), Equivalent Annual Value (EAV), and Average Production Cost (APC). Economic risk was evaluated through Monte Carlo simulation (10,000 iterations), considering ±10% variation in interest rate, transportation distance, harvesting productivity, labor, fuel, lubricant, and road maintenance costs, followed by sensitivity and correlation analyses. The project was economically viable, presenting an NPV of USD 110.11 ha−1, an IRR of 8.0%, an EAV of USD 20.43 ha−1 year−1, and an APC of USD 29.11 m−3. Transportation distance showed a limited operational slack of only 10 km when land cost was considered, indicating that the project operates close to its economic limit. Monte Carlo simulation indicated an 11.5% probability of economic infeasibility, while interest rate, transportation distance, and manual loading cost exerted the greatest negative influence on NPV. The integrated deterministic and probabilistic approach enabled the identification of critical operational thresholds for transportation distance, timber price, wood productivity, and land cost under the evaluated conditions, providing practical decision-support parameters for transportation planning, cost management, and economic risk assessment in similar forestry projects.

ForestsVol. 17(7)
Universidade Federal de Minas Gerais (BR), International Foundation for Electoral Systems (US), Universidade Federal de Viçosa (BR), Universidade de Brasília (BR), Southwest Bahia State University (BR), Universidade Estadual da Região Tocantina do Maranhão (BR), Instituto Federal do Espírito Santo (BR), Universidade Federal do Espírito Santo (BR), Universidade Estadual Paulista (Unesp) (BR)
Conselho Nacional de Desenvolvimento Científico e Tecnológico
Openalex Percentile: Top 14%
Forest Biomass Utilization and Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.