Sealed preregistration KS-CAM — v1.2: Day-D Calibration Record — INDETERMINATE-by-calibration (partial Lock; Block D not executed)

Day-D calibration was executed on ibm_kingston, trio [13,14,15] (Batch e2e4778b, jobs d9cj4tsi/d9cjh21h/d9cjhsan, PLAN:369ff001573e1c7ff9cb8601, drift bracket PASS). The frozen theta_cal gate FAILED with 14 causes (T2-echo/Ramsey sector: fits pegged at bounds, c_corr unidentifiable, holdout envelope out of jurisdiction), verdict INDETERMINATE-by-calibration. Per the published governance (v1.1, DOI 10.5281/zenodo.21385546), Block D was NOT executed and remains prohibited. Forensic note: T1, readout, T_qs(q0,q1) and static ZZ fitted sanely; the failure signature indicates a physics gap in the frozen M5 echo/Ramsey fit models (missing amplitude-damping floor at long delays), exposed only by real hardware — synthetic and mock banks could not see it. This record contains the raw calibration suite and the partial Lock for full traceability of why the trial did not open. Lock sha256: 5482d46166253fa89ab370eac860dfa7e77ccd51944c41b42d6463a511e6ad4c. Calibration suite sha256: 3069ae38347ad726603b4c8d260ef18d3964cf1e6d9c8b8a3f820ac2f322c073. Blinding commitment (unused today): ade1a565f6e28d8214582d79... No result on xi_0 exists.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-07-16
DOI
https://doi.org/10.5281/zenodo.21401659
Primary Topic
Cardiac electrophysiology and arrhythmias
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
preprint

Sealed preregistration KS-CAM — v1.2: Day-D Calibration Record — INDETERMINATE-by-calibration (partial Lock; Block D not executed)

Arturo Cerezo
Zenodo (CERN European Organization for Nuclear Research)
Cardiac electrophysiology and arrhythmias
preprint

Sealed preregistration KS-CAM — v1.2: Day-D Calibration Record — INDETERMINATE-by-calibration (partial Lock; Block D not executed)

Arturo Cerezo
preprint en

Abstract

Day-D calibration was executed on ibm_kingston, trio [13,14,15] (Batch e2e4778b, jobs d9cj4tsi/d9cjh21h/d9cjhsan, PLAN:369ff001573e1c7ff9cb8601, drift bracket PASS). The frozen theta_cal gate FAILED with 14 causes (T2-echo/Ramsey sector: fits pegged at bounds, c_corr unidentifiable, holdout envelope out of jurisdiction), verdict INDETERMINATE-by-calibration. Per the published governance (v1.1, DOI 10.5281/zenodo.21385546), Block D was NOT executed and remains prohibited. Forensic note: T1, readout, T_qs(q0,q1) and static ZZ fitted sanely; the failure signature indicates a physics gap in the frozen M5 echo/Ramsey fit models (missing amplitude-damping floor at long delays), exposed only by real hardware — synthetic and mock banks could not see it. This record contains the raw calibration suite and the partial Lock for full traceability of why the trial did not open. Lock sha256: 5482d46166253fa89ab370eac860dfa7e77ccd51944c41b42d6463a511e6ad4c. Calibration suite sha256: 3069ae38347ad726603b4c8d260ef18d3964cf1e6d9c8b8a3f820ac2f322c073. Blinding commitment (unused today): ade1a565f6e28d8214582d79... No result on xi_0 exists.

Zenodo (CERN European Organization for Nuclear Research)
Peace, Justice and strong institutions
Cardiac electrophysiology and arrhythmias
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.